Skip Maine state header navigation
LETTING DATSTP-9132(00)X MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 1
LOCATION : UNITY TABULATION OF BIDS
KNOX
THORNDIKE CONTRACT ID : 009131.00
=========
COMPLETION DATE : 08/18/00
PROJECT(S): STP-9131(00)X COUNTIE(S) : WALDO MAINE STATE DEPTARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
CONTRACT DESCRIPTION : LEVEL I RESURFACING ATTEST : _______________________________
NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000059 PIKE INDUSTRIES, INC. $ 933,835.51 100.0000%
2 000022 THE LANE CONSTRUCTION CORP. $ 1,041,272.18 111.5049%
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000022 |( )
|PIKE INDUSTRIES, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 107.27 LUMP| 7400.00000 7400.00| 20000.00000 20000.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0020 202.203 610.000 M2 | 12.00000 7320.00| 14.00000 8540.00|
PAVEMENT BUTT JOINTS | | |
0030 203.202 1890.000 M | 5.50000 10395.00| 6.00000 11340.00|
INSLOPE EXCAVATION | | |
0040 203.203 2660.000 M | 8.00000 21280.00| 7.00000 18620.00|
DITCH EXCAVATION | | |
0050 203.25 15.000 M3 | 45.00000 675.00| 40.00000 600.00|
GRANULAR BORROW | | |
0060 204.41 17300.000 M2 | 3.75000 64875.00| 3.15000 54495.00|
REHABILITATION OF EXISTING SHOULDERS, | | |
PLAN QUANTITY | | |
0070 307.32 6680.000 M2 | 1.75000 11690.00| 1.35000 9018.00|
COLD IN-PLACE RECYCLED MATERIAL | | |
(UNTREATED) TRAVELWAY | | |
0080 403.208 1535.000 MG | 33.00000 50655.00| 38.40000 58944.00|
HOT MIX ASPHALT 12.5 MM NOMINAL MAX SIZ | | |
0090 403.209 90.000 MG | 75.00000 6750.00| 90.00000 8100.00|
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0100 403.210 9765.000 MG | 33.00000 322245.00| 38.90000 379858.50|
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
LETTING DATE : 02/16/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 2
LOCATION : UNITY TABULATION OF BIDS
KNOX
THORNDIKE CONTRACT ID : 009131.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000022 |( )
|PIKE INDUSTRIES, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0110 403.211 5547.070 MG | 33.00000 183053.31| 42.00000 232976.94|
HOT MIX ASPHALT (SHIM) | | |
0120 409.15 11840.000 L | 0.80000 9472.00| 1.50000 17760.00|
BITUMINOUS TACK COAT APPLIED | | |
0130 411.10 205.000 M3 | 45.00000 9225.00| 30.00000 6150.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0140 603.16 25.000 M | 90.00000 2250.00| 127.00000 3175.00|
375 MM CULVERT PIPE OPTION I | | |
0150 603.17 12.150 M | 95.00000 1154.25| 147.00000 1786.05|
450 MM CULVERT PIPE OPTION I | | |
0160 603.179 90.480 M | 205.00000 18548.40| 265.00000 23977.20|
450 MM CULVERT PIPE OPTION III | | |
0170 603.19 9.750 M | 105.00000 1023.75| 175.00000 1706.25|
600 MM CULVERT PIPE OPTION I | | |
0180 603.219 6.000 M | 215.00000 1290.00| 220.00000 1320.00|
900 MM CULVERT PIPE OPTION III | | |
0190 604.092 1.000 EA | 1500.00000 1500.00| 2700.00000 2700.00|
CATCH BASIN TYPE B1-C | | |
0200 604.18 4.000 EA | 500.00000 2000.00| 400.00000 1600.00|
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0210 606.17 210.000 M | 29.43000 6180.30| 32.35000 6793.50|
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0220 606.21 7.620 M | 32.71000 249.25| 39.00000 297.18|
GUARDRAIL TYPE 3B - 4.5 M RADIUS OR LES | | |
0230 606.22 7.620 M | 32.71000 249.25| 38.00000 289.56|
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0240 606.265 2.000 EA | 50.00000 100.00| 25.00000 50.00|
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0250 606.35 10.000 EA | 25.00000 250.00| 25.00000 250.00|
GUARDRAIL DELINEATOR POST | | |
0260 606.47 10.000 EA | 30.00000 300.00| 25.00000 250.00|
SINGLE WOOD POST | | |
0270 606.752 2.000 EA | 800.00000 1600.00| 700.00000 1400.00|
WIDEN SHOULDER FOR MODIFIED ECCENTRIC | | |
LOADER TERMINAL | | |
0280 606.76 2.000 EA | 1300.00000 2600.00| 1100.00000 2200.00|
MODIFIED ECCENTRIC LOADER TERMINAL | | |
0290 609.31 130.000 M | 15.00000 1950.00| 15.00000 1950.00|
CURB TYPE 3 | | |
LETTING DATE : 02/16/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 3
LOCATION : UNITY TABULATION OF BIDS
KNOX
THORNDIKE CONTRACT ID : 009131.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000022 |( )
|PIKE INDUSTRIES, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0300 610.18 400.000 M3 | 45.00000 18000.00| 52.00000 20800.00|
STONE DITCH PROTECTION | | |
0310 613.319 2400.000 M2 | 1.35000 3240.00| 1.40000 3360.00|
TEMPORARY EROSION CONTROL BLANKET | | |
0320 618.1401 260.000 UN | 15.75000 4095.00| 9.85000 2561.00|
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0330 619.1201 260.000 UN | 6.50000 1690.00| 7.65000 1989.00|
MULCH - PLAN QUANTITY | | |
0340 627.76 LUMP| 3500.00000 3500.00| 5000.00000 5000.00|
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0350 629.05 25.000 MH | 25.00000 625.00| 18.00000 450.00|
HAND LABOR, STRAIGHT TIME | | |
0360 631.12 25.000 HR | 80.00000 2000.00| 77.00000 1925.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0370 631.132 20.000 HR | 70.00000 1400.00| 58.00000 1160.00|
SMALL BULLDOZER (INCLUDING OPERATOR) | | |
0380 631.14 30.000 HR | 85.00000 2550.00| 70.00000 2100.00|
GRADER (INCLUDING OPERATOR) | | |
0390 631.172 35.000 HR | 45.00000 1575.00| 40.00000 1400.00|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0400 631.18 5.000 HR | 65.00000 325.00| 25.00000 125.00|
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0410 631.21 5.000 HR | 65.00000 325.00| 45.00000 225.00|
ROAD BROOM (INCLUDING OPERATORS AND | | |
HAULER) | | |
0420 631.22 20.000 HR | 55.00000 1100.00| 67.00000 1340.00|
FRONT END LOADER (INCLUDING OPERATOR) | | |
0430 631.32 30.000 HR | 150.00000 4500.00| 140.00000 4200.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0440 637.07 100.000 M3 | 5.00000 500.00| 4.00000 400.00|
SPRINKLING | | |
0450 639.19 1.000 EA | 4000.00000 4000.00| 4000.00000 4000.00|
FIELD OFFICE TYPE B | | |
0460 652.31 10.000 EA | 25.00000 250.00| 40.00000 400.00|
TYPE I BARRICADE | | |
0470 652.33 20.000 EA | 55.00000 1100.00| 40.00000 800.00|
DRUM | | |
0480 652.34 80.000 EA | 15.00000 1200.00| 25.00000 2000.00|
CONE | | |
LETTING DATE : 02/16/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 4
LOCATION : UNITY TABULATION OF BIDS
KNOX
THORNDIKE CONTRACT ID : 009131.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000022 |( )
|PIKE INDUSTRIES, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0490 652.35 86.000 M2 | 60.00000 5160.00| 90.00000 7740.00|
CONSTRUCTION SIGNS | | |
0500 652.36 92.000 CD | 100.00000 9200.00| 100.00000 9200.00|
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0510 652.38 1730.000 MH | 14.00000 24220.00| 15.00000 25950.00|
FLAGGER | | |
0520 659.10 LUMP| 76000.00000 76000.00| 50000.00000 50000.00|
MOBILIZATION | | |
0530 304.132 3000.000 M3 | 7.00000 21000.00| 6.00000 18000.00|
COLD RECYCLED AGGREGATE - TRUCK MEASURE | | |
SECTION TOTALS | $ 933,835.51| $ 1,041,272.18| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 933,835.51| $ 1,041,272.18| $
====================================================================================================================================