LETTING DATOTHERS9(01)E MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/05/01
PAGE : 1
LOCATION : SANDY BAY TWP. TABULATION OF BIDS
DENNISTOWN PLT
PARLIN POND TWP. CONTRACT ID : 009076.00
JACKMAN =========
WEST FORKS PLT
COMPLETION DATE : 10/07/01
PROJECT(S): NH-9076(00)E COUNTIE(S) : SOMERSET MAINE STATE DEPTARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
CONTRACT DESCRIPTION : LEVEL 2 RESURFACING ATTEST : _______________________________
NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000529 BARRETT PAVING MATERIALS, INC. $ 3,794,727.42 100.0000%
====================================================================================================================================
|( 1 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.202 126070.000 M2 | 1.00000 126070.00| |
REMOVING PAVEMENT SURFACE | | |
0020 202.203 1320.000 M2 | 24.65000 32538.00| |
PAVEMENT BUTT JOINTS | | |
0030 204.20 7190.000 M2 | 1.30000 9347.00| |
ADD SHOULDER AGGREGATE TO EXISTING | | |
SHOULDER, PLAN QUANTITY | | |
0040 403.207 300.000 MG | 73.15000 21945.00| |
HOT MIX ASPHALT 19.0 MM NOMINAL MAX SIZ | | |
0050 403.209 200.000 MG | 136.25000 27250.00| |
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0060 403.210 37125.000 MG | 51.70000 1919362.50| |
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0070 403.212 12800.000 MG | 46.60000 596480.00| |
HOT MIX ASPHALT 4.75 MM | | |
0080 409.15 56250.000 L | 0.40000 22500.00| |
BITUMINOUS TACK COAT APPLIED | | |
0090 411.10 690.000 M3 | 64.00000 44160.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0100 603.19 292.000 M | 99.30000 28995.60| |
600 MM CULVERT PIPE OPTION I | | |
0110 604.161 1.000 EA | 725.00000 725.00| |
ALTERING CATCH BASIN | | |
LETTING DATE : 02/21/01 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/05/01
PAGE : 2
LOCATION : SANDY BAY TWP. TABULATION OF BIDS
DENNISTOWN PLT
PARLIN POND TWP. CONTRACT ID : 009076.00
JACKMAN =========
WEST FORKS PLT
====================================================================================================================================
|( 1 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 604.18 19.000 EA | 400.00000 7600.00| |
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0130 606.17 771.000 M | 30.90000 23823.90| |
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0140 606.1721 5.000 EA | 1532.25000 7661.25| |
BRIDGE TRANSITION - TYPE 1 | | |
0150 606.1731 1.000 EA | 1560.65000 1560.65| |
BRIDGE CONNECTION TYPE 1 | | |
0160 606.178 448.000 M | 14.90000 6675.20| |
GUARDRAIL BEAM | | |
0170 606.21 37.800 M | 34.65000 1309.77| |
GUARDRAIL TYPE 3B - 4.5 M RADIUS OR LES | | |
0180 606.22 22.900 M | 34.65000 793.49| |
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0190 606.265 9.000 EA | 45.40000 408.60| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0200 606.35 166.000 EA | 28.40000 4714.40| |
GUARDRAIL DELINEATOR POST | | |
0210 606.362 4355.000 M | 4.65000 20250.75| |
GUARDRAIL ADJUSTED | | |
0220 606.367 40.000 EA | 39.70000 1588.00| |
REPLACE UNUSABLE EXISTING GUARDRAIL | | |
POSTS | | |
0230 606.65 121.900 M | 53.25000 6491.18| |
GUARDRAIL THRIE BEAM - SINGLE RAIL | | |
0240 606.66 2.000 EA | 113.50000 227.00| |
TERMINAL END THRIE BEAM | | |
0250 606.70 3.000 EA | 141.90000 425.70| |
TRANSITION SECTION THRIE BEAM | | |
0260 606.71 3.800 M | 86.40000 328.32| |
GUARDRAIL THRIE BEAM - 4.5 METER RADIUS | | |
AND LESS | | |
0270 606.72 11.400 M | 86.40000 984.96| |
GUARDRAIL THRIE BEAM GREATER THAN 4.5 | | |
METER RADIUS | | |
0280 606.754 16.000 EA | 2115.50000 33848.00| |
WIDEN SHOULDER FOR 350 END TREATMENT | | |
0290 606.79 68.000 EA | 1929.50000 131206.00| |
GUARDRAIL 350 FLARED TERMINAL | | |
LETTING DATE : 02/21/01 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/05/01
PAGE : 3
LOCATION : SANDY BAY TWP. TABULATION OF BIDS
DENNISTOWN PLT
PARLIN POND TWP. CONTRACT ID : 009076.00
JACKMAN =========
WEST FORKS PLT
====================================================================================================================================
|( 1 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0300 609.31 520.000 M | 33.50000 17420.00| |
CURB TYPE 3 | | |
0310 610.08 15.000 M3 | 92.50000 1387.50| |
PLAIN RIPRAP | | |
0320 613.319 3375.000 M2 | 0.85000 2868.75| |
TEMPORARY EROSION CONTROL BLANKET | | |
0330 618.1401 900.000 UN | 14.75000 13275.00| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0340 619.1201 900.000 UN | 9.10000 8190.00| |
MULCH - PLAN QUANTITY | | |
0350 627.76 LUMP| 6400.00000 6400.00| |
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0360 629.05 100.000 MH | 33.45000 3345.00| |
HAND LABOR, STRAIGHT TIME | | |
0370 631.12 110.000 HR | 96.90000 10659.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0380 631.14 200.000 HR | 97.35000 19470.00| |
GRADER (INCLUDING OPERATOR) | | |
0390 631.172 110.000 HR | 45.40000 4994.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0400 639.19 1.000 EA | 9500.00000 9500.00| |
FIELD OFFICE TYPE B | | |
0410 652.31 50.000 EA | 106.80000 5340.00| |
TYPE I BARRICADE | | |
0420 652.34 350.000 EA | 15.90000 5565.00| |
CONE | | |
0430 652.35 270.000 M2 | 73.75000 19912.50| |
CONSTRUCTION SIGNS | | |
0440 652.36 190.000 CD | 150.00000 28500.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0450 652.38 4550.000 MH | 15.60000 70980.00| |
FLAGGER | | |
0460 656.55 24.000 M3 | 64.60000 1550.40| |
DUMPED STONE | | |
0470 659.10 LUMP| 486100.00000 486100.00| |
MOBILIZATION | | |
SECTION TOTALS | $ 3,794,727.42| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 3,794,727.42| $ | $
====================================================================================================================================