LETTING DATAC-STP-9206(00)X MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/06/01
PAGE : 1
LOCATION : BELFAST TABULATION OF BIDS
WALDO
BROOKS CONTRACT ID : 009206.00
=========
COMPLETION DATE : 09/01/02
PROJECT(S): STP-7920(00)X COUNTIE(S) : WALDO MAINE STATE DEPTARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
CONTRACT DESCRIPTION : CHIP ATTEST : _______________________________
NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 THE LANE CONSTRUCTION CORP. $ 2,745,414.10 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.202 120.000 M2 | 12.00000 1440.00| |
REMOVING PAVEMENT SURFACE | | |
0020 202.203 710.000 M2 | 12.00000 8520.00| |
PAVEMENT BUTT JOINTS | | |
0030 203.20 6760.000 M3 | 10.50000 70980.00| |
COMMON EXCAVATION | | |
0040 203.202 1960.000 M | 7.00000 13720.00| |
INSLOPE EXCAVATION | | |
0050 203.203 6510.000 M | 6.50000 42315.00| |
DITCH EXCAVATION | | |
0060 203.204 220.000 M | 12.00000 2640.00| |
NEW DITCH EXCAVATION | | |
0070 203.21 1070.000 M3 | 85.00000 90950.00| |
ROCK EXCAVATION | | |
0080 206.061 50.000 M3 | 30.00000 1500.00| |
STRUCTURAL EARTH EXCAVATION - DRAINAGE | | |
AND MINOR STRUCTURES, BELOW GRADE | | |
0090 206.07 50.000 M3 | 140.00000 7000.00| |
STRUCTURAL ROCK EXCAVATION - DRAINAGE | | |
AND MINOR STRUCTURES | | |
0100 304.103 3740.000 M3 | 14.00000 52360.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0110 304.104 5500.000 M3 | 15.50000 85250.00| |
AGGREGATE SUBBASE COURSE - GRAVEL (PLAN | | |
QUANTITY) | | |
LETTING DATE : 09/05/01 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/06/01
PAGE : 2
LOCATION : BELFAST TABULATION OF BIDS
WALDO
BROOKS CONTRACT ID : 009206.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 307.32 85900.000 M2 | 1.60000 137440.00| |
COLD IN-PLACE RECYCLED MATERIAL | | |
(UNTREATED) TRAVELWAY | | |
0130 403.207 30770.000 MG | 33.40000 1027718.00| |
HOT MIX ASPHALT 19.0 MM NOMINAL MAX SIZ | | |
0140 403.209 280.000 MG | 90.00000 25200.00| |
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0150 403.210 8510.000 MG | 36.90000 314019.00| |
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0160 411.10 100.000 M3 | 40.00000 4000.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0170 603.16 282.000 M | 92.00000 25944.00| |
375 MM CULVERT PIPE OPTION I | | |
0180 603.17 168.000 M | 110.00000 18480.00| |
450 MM CULVERT PIPE OPTION I | | |
0190 603.179 360.000 M | 190.00000 68400.00| |
450 MM CULVERT PIPE OPTION III | | |
0200 603.199 60.000 M | 267.00000 16020.00| |
600 MM CULVERT PIPE OPTION III | | |
0210 603.21 18.200 M | 160.00000 2912.00| |
900 MM CULVERT PIPE OPTION I | | |
0220 603.219 10.000 M | 300.00000 3000.00| |
900 MM CULVERT PIPE OPTION III | | |
0230 603.249 7.300 M | 1700.00000 12410.00| |
1350 MM CULVERT PIPE OPTION III | | |
0240 603.7324 12.200 M | 267.00000 3257.40| |
REMOVE AND RELAY 600 MM METAL PIPE | | |
0250 604.11 1.000 EA | 2800.00000 2800.00| |
CATCH BASIN TYPE C1 | | |
0260 605.09 650.000 M | 78.00000 50700.00| |
150 MM UNDERDRAIN TYPE B | | |
0270 605.10 60.000 M | 78.00000 4680.00| |
150 MM UNDERDRAIN OUTLET | | |
0280 606.17 446.000 M | 27.20000 12131.20| |
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0290 606.178 38.100 M | 14.80000 563.88| |
GUARDRAIL BEAM | | |
0300 606.21 26.600 M | 32.60000 867.16| |
GUARDRAIL TYPE 3B - 4.5 M RADIUS OR LES | | |
LETTING DATE : 09/05/01 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/06/01
PAGE : 3
LOCATION : BELFAST TABULATION OF BIDS
WALDO
BROOKS CONTRACT ID : 009206.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 606.22 26.600 M | 32.60000 867.16| |
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0320 606.265 7.000 EA | 30.00000 210.00| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0330 606.35 20.000 EA | 25.00000 500.00| |
GUARDRAIL DELINEATOR POST | | |
0340 606.364 303.000 M | 16.50000 4999.50| |
GUARDRAIL REMOVE, MODIFY AND RESET, | | |
TYPE 3B | | |
0350 606.367 10.000 EA | 30.00000 300.00| |
REPLACE UNUSABLE EXISTING GUARDRAIL | | |
POSTS | | |
0360 606.47 20.000 EA | 25.00000 500.00| |
SINGLE WOOD POST | | |
0370 606.752 5.000 EA | 870.00000 4350.00| |
WIDEN SHOULDER FOR MODIFIED ECCENTRIC | | |
LOADER TERMINAL | | |
0380 606.76 5.000 EA | 1100.00000 5500.00| |
MODIFIED ECCENTRIC LOADER TERMINAL | | |
0390 609.31 415.000 M | 16.00000 6640.00| |
CURB TYPE 3 | | |
0400 610.08 220.000 M3 | 70.00000 15400.00| |
PLAIN RIPRAP | | |
0410 610.18 5100.000 M3 | 37.00000 188700.00| |
STONE DITCH PROTECTION | | |
0420 613.319 8280.000 M2 | 1.70000 14076.00| |
TEMPORARY EROSION CONTROL BLANKET | | |
0430 615.07 75.000 M3 | 33.00000 2475.00| |
LOAM | | |
0440 617.381 100.000 M3 | 45.00000 4500.00| |
WOOD WASTE EROSION CONTROL MIX | | |
0450 618.1301 15.000 UN | 12.00000 180.00| |
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0460 618.1401 765.000 UN | 13.35000 10212.75| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0470 619.1201 765.000 UN | 6.85000 5240.25| |
MULCH - PLAN QUANTITY | | |
0480 620.58 10200.000 M2 | 2.70000 27540.00| |
EROSION CONTROL GEOTEXTILE | | |
0490 627.75 40.000 M2 | 21.52000 860.80| |
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
LETTING DATE : 09/05/01 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/06/01
PAGE : 4
LOCATION : BELFAST TABULATION OF BIDS
WALDO
BROOKS CONTRACT ID : 009206.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0500 627.76 LUMP| 10000.00000 10000.00| |
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0510 629.05 50.000 MH | 20.00000 1000.00| |
HAND LABOR, STRAIGHT TIME | | |
0520 631.111 5.000 HR | 200.00000 1000.00| |
TRACTOR MOUNTED HYDRAULIC HAMMER | | |
0530 631.12 50.000 HR | 87.00000 4350.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0540 631.14 25.000 HR | 90.00000 2250.00| |
GRADER (INCLUDING OPERATOR) | | |
0550 631.172 100.000 HR | 42.00000 4200.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0560 631.18 10.000 HR | 27.00000 270.00| |
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0570 631.32 20.000 HR | 110.00000 2200.00| |
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0580 639.18 1.000 EA | 5000.00000 5000.00| |
FIELD OFFICE TYPE A | | |
0590 652.31 25.000 EA | 35.00000 875.00| |
TYPE I BARRICADE | | |
0600 652.33 50.000 EA | 30.00000 1500.00| |
DRUM | | |
0610 652.34 200.000 EA | 20.00000 4000.00| |
CONE | | |
0620 652.35 190.000 M2 | 90.00000 17100.00| |
CONSTRUCTION SIGNS | | |
0630 652.36 195.000 CD | 120.00000 23400.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0640 652.38 5600.000 MH | 12.50000 70000.00| |
FLAGGER | | |
0650 656.75 LUMP| 35000.00000 35000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0660 659.10 LUMP| 160000.00000 160000.00| |
MOBILIZATION | | |
0670 660.21 3000.000 MH | 1.00000 3000.00| |
ON-THE-JOB TRAINING (BID) | | |
SECTION TOTALS | $ 2,745,414.10| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 2,745,414.10| $ | $
====================================================================================================================================