LETTING DATE : 04/17/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 1
LOCATION : AUBURN TABULATION OF BIDS
CONTRACT ID : 010251.00 COMPLETION DATE : 09/28/02
=========
PROJECT(S): STP-1025(100)X COUNTIE(S) : ANDROSCOGGIN MAINE STATE DEPARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : LEVEL 2 RESURFACING NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000403 PRATT & SONS INC. $ 996,286.00 100.0000%
2 000272 A & V CONSTRUCTION, CORP. $ 1,069,616.50 107.3604%
====================================================================================================================================
|( 1 ) 000403 |( 2 ) 000272 |( )
|PRATT & SONS INC. |A & V CONSTRUCTION, CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.202 52400.000 M2 | 1.60000 83840.00| 2.00000 104800.00|
REMOVING PAVEMENT SURFACE | | |
0020 202.203 480.000 M2 | 31.00000 14880.00| 19.00000 9120.00|
PAVEMENT BUTT JOINTS | | |
0030 203.2001 95.000 M3 | 11.50000 1092.50| 22.50000 2137.50|
COMMON EXCAVATION - PLAN QUANTITY | | |
0040 304.104 70.000 M3 | 34.00000 2380.00| 72.00000 5040.00|
AGGREGATE SUBBASE COURSE - GRAVEL (PLAN | | |
QUANTITY) | | |
0050 403.207 520.000 MG | 86.00000 44720.00| 111.00000 57720.00|
HOT MIX ASPHALT 19.0 MM NOMINAL MAX SIZ | | |
0060 403.208 5030.000 MG | 38.00000 191140.00| 36.50000 183595.00|
HOT MIX ASPHALT 12.5 MM, SURFACE | | |
0070 403.209 920.000 MG | 84.00000 77280.00| 83.00000 76360.00|
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0080 409.15 10500.000 L | 1.00000 10500.00| 0.90000 9450.00|
BITUMINOUS TACK COAT APPLIED | | |
0090 411.10 50.000 M3 | 55.00000 2750.00| 50.00000 2500.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0100 603.169 20.000 M | 255.00000 5100.00| 120.00000 2400.00|
375 MM CULVERT PIPE OPTION III | | |
0110 604.161 56.000 EA | 700.00000 39200.00| 450.00000 25200.00|
ALTERING CATCH BASIN | | |
LETTING DATE : 04/17/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 2
LOCATION : AUBURN TABULATION OF BIDS
CONTRACT ID : 010251.00
=========
====================================================================================================================================
|( 1 ) 000403 |( 2 ) 000272 |( )
|PRATT & SONS INC. |A & V CONSTRUCTION, CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 604.18 34.000 EA | 300.00000 10200.00| 275.00000 9350.00|
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0130 608.45 725.000 M2 | 15.50000 11237.50| 40.00000 29000.00|
CONSTRUCTING SIDEWALK | | |
0140 608.46 5700.000 M2 | 12.50000 71250.00| 14.00000 79800.00|
REGRADING SIDEWALK | | |
0150 609.11 20.000 M | 89.00000 1780.00| 190.00000 3800.00|
VERTICAL CURB TYPE 1 | | |
0160 609.12 30.000 M | 99.00000 2970.00| 150.00000 4500.00|
VERTICAL CURB TYPE 1 - CIRCULAR | | |
0170 609.234 53.000 EA | 136.00000 7208.00| 268.00000 14204.00|
TERMINAL CURB TYPE 1 - 1.2 METER | | |
0180 609.237 164.000 EA | 212.00000 34768.00| 210.00000 34440.00|
TERMINAL CURB TYPE 1 - 2.1 METER | | |
0190 609.2371 14.000 EA | 240.00000 3360.00| 170.00000 2380.00|
TERMINAL CURB TYPE 1- 2.1M - CIRCULAR | | |
0200 609.31 650.000 M | 17.00000 11050.00| 12.00000 7800.00|
CURB TYPE 3 | | |
0210 609.34 10.000 M | 50.00000 500.00| 53.00000 530.00|
CURB TYPE 5 | | |
0220 609.38 3200.000 M | 44.00000 140800.00| 52.00000 166400.00|
RESET CURB TYPE 1 | | |
0230 613.319 30.000 M2 | 1.70000 51.00| 4.50000 135.00|
EROSION CONTROL BLANKET | | |
0240 615.07 135.000 M3 | 55.00000 7425.00| 40.00000 5400.00|
LOAM | | |
0250 618.1301 36.000 UN | 36.00000 1296.00| 35.00000 1260.00|
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0260 619.1201 36.000 UN | 8.00000 288.00| 7.50000 270.00|
MULCH - PLAN QUANTITY | | |
0270 627.711 9300.000 M | 0.35000 3255.00| 0.33000 3069.00|
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY ) | | |
0280 627.75 116.000 M2 | 11.25000 1305.00| 11.00000 1276.00|
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
0290 627.76 LUMP| 6800.00000 6800.00| 6500.00000 6500.00|
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0300 629.05 20.000 MH | 34.00000 680.00| 30.00000 600.00|
HAND LABOR, STRAIGHT TIME | | |
LETTING DATE : 04/17/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 3
LOCATION : AUBURN TABULATION OF BIDS
CONTRACT ID : 010251.00
=========
====================================================================================================================================
|( 1 ) 000403 |( 2 ) 000272 |( )
|PRATT & SONS INC. |A & V CONSTRUCTION, CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 631.10 10.000 HR | 37.00000 370.00| 150.00000 1500.00|
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0320 631.11 10.000 HR | 37.00000 370.00| 65.00000 650.00|
AIR TOOL (INCLUDING OPERATOR) | | |
0330 631.12 30.000 HR | 95.00000 2850.00| 100.00000 3000.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0340 631.172 30.000 HR | 42.00000 1260.00| 60.00000 1800.00|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0350 631.32 10.000 HR | 165.00000 1650.00| 200.00000 2000.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0360 639.19 1.000 EA | 3200.00000 3200.00| 2000.00000 2000.00|
FIELD OFFICE TYPE B | | |
0370 643.86 7.000 EA | 940.00000 6580.00| 900.00000 6300.00|
TRAFFIC SIGNAL LOOP DETECTORS | | |
0380 652.33 50.000 EA | 70.00000 3500.00| 55.00000 2750.00|
DRUM | | |
0390 652.34 100.000 EA | 14.00000 1400.00| 20.00000 2000.00|
CONE | | |
0400 652.35 98.000 M2 | 100.00000 9800.00| 110.00000 10780.00|
CONSTRUCTION SIGNS | | |
0410 652.36 180.000 CD | 110.00000 19800.00| 60.00000 10800.00|
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0420 652.38 3600.000 MH | 15.00000 54000.00| 15.00000 54000.00|
FLAGGER | | |
0430 656.75 LUMP| 6400.00000 6400.00| 29000.00000 29000.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0440 659.10 LUMP| 96000.00000 96000.00| 94000.00000 94000.00|
MOBILIZATION | | |
SECTION TOTALS | $ 996,286.00| $ 1,069,616.50| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------