Skip Maine state header navigation
LETTING DATE : 04/10/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 1
LOCATION : TABULATION OF BIDS
CONTRACT ID : 007765.12 COMPLETION DATE : 10/05/02
=========
PROJECT(S): STP-7765(12)X COUNTIE(S) : AROOSTOOK MAINE STATE DEPARTMENT OF TRANSPORTATION
10261.00
STP-1056(700)X A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : LEVEL 2 OVERLAY NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 THE LANE CONSTRUCTION CORP. $ 1,842,550.26 100.0000%
2 001576 THE MILLER GROUP, INC. $ 1,992,034.34 108.1129%
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 001576 |( )
|THE LANE CONSTRUCTION CORP. |THE MILLER GROUP, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.203 15.000 M2 | 40.00000 600.00| 62.50000 937.50|
PAVEMENT BUTT JOINTS | | |
0020 203.202 11642.000 M | 7.20000 97920.00| 8.50000 115600.00|
INSLOPE EXCAVATION | | |
0030 203.203 4800.000 M | 10.20000 68442.00| 10.25000 68777.50|
DITCH EXCAVATION | | |
0040 204.41 27966.000 M2 | 4.80000 156624.00| 5.31000 173265.30|
REHABILITATION OF EXISTING SHOULDERS, | | |
PLAN QUANTITY | | |
0050 304.103 220.000 M3 | 15.00000 3300.00| 27.50000 6050.00|
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0060 307.41 56670.000 M2 | 6.50000 460655.00| 5.91000 418841.70|
COLD IN-PLACE RECYCLED PAVEMENT (WITH | | |
FOAMED ASPHALT) | | |
0070 403.209 40.000 MG | 85.00000 3400.00| 95.00000 3800.00|
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0080 403.210 4750.000 MG | 42.00000 242760.00| 52.69000 304548.20|
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0090 403.211 4000.000 MG | 43.00000 248540.00| 52.69000 304548.20|
HOT MIX ASPHALT (SHIM) | | |
0100 409.15 11340.000 L | 1.30000 14742.00| 1.63000 18484.20|
BITUMINOUS TACK COAT APPLIED | | |
LETTING DATE : 04/10/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 2
LOCATION : TABULATION OF BIDS
CONTRACT ID : 007765.12
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 001576 |( )
|THE LANE CONSTRUCTION CORP. |THE MILLER GROUP, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0110 411.10 130.000 M3 | 65.00000 8450.00| 27.50000 3575.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0120 603.16 32.310 M | 125.00000 5181.25| 112.50000 4663.13|
375 MM CULVERT PIPE OPTION I | | |
0130 603.17 25.000 M | 135.00000 3375.00| 125.00000 3125.00|
450 MM CULVERT PIPE OPTION I | | |
0140 603.179 221.290 M | 230.00000 50896.70| 187.50000 41491.88|
450 MM CULVERT PIPE OPTION III | | |
0150 603.199 137.150 M | 300.00000 47547.00| 218.75000 34669.69|
600 MM CULVERT PIPE OPTION III | | |
0160 603.209 12.800 M | 300.00000 3840.00| 375.00000 4800.00|
750 MM CULVERT PIPE OPTION III | | |
0170 603.219 46.330 M | 325.00000 15057.25| 250.00000 11582.50|
900 MM CULVERT PIPE OPTION III | | |
0180 603.239 12.190 M | 350.00000 4266.50| 406.25000 4952.19|
1200 MM CULVERT PIPE OPTION III | | |
0190 606.17 2096.000 M | 35.00000 73360.00| 40.00000 83840.00|
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0200 606.1722 4.000 EA | 1000.00000 4000.00| 1250.00000 5000.00|
BRIDGE TRANSITION - TYPE 2 | | |
0210 606.22 53.340 M | 34.00000 1813.56| 42.50000 2266.95|
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0220 606.265 7.000 EA | 50.00000 350.00| 37.50000 262.50|
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0230 606.35 74.000 EA | 25.00000 1850.00| 31.25000 2312.50|
GUARDRAIL DELINEATOR POST | | |
0240 606.361 70.000 M | 25.00000 1750.00| 31.25000 2187.50|
GUARDRAIL REMOVE AND RESET TYPE 3B | | |
0250 606.752 25.000 EA | 700.00000 17500.00| 1250.00000 31250.00|
WIDEN SHOULDER FOR MODIFIED ECCENTRIC | | |
LOADER TERMINAL | | |
0260 606.76 25.000 EA | 1200.00000 30000.00| 31.25000 781.25|
MODIFIED ECCENTRIC LOADER TERMINAL | | |
0270 609.31 20.000 M | 18.00000 360.00| 31.25000 625.00|
CURB TYPE 3 | | |
0280 610.08 310.000 M3 | 55.00000 17050.00| 162.50000 50375.00|
PLAIN RIPRAP | | |
0290 613.319 5760.000 M2 | 2.00000 16380.00| 2.38000 19492.20|
EROSION CONTROL BLANKET | | |
LETTING DATE : 04/10/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 3
LOCATION : TABULATION OF BIDS
CONTRACT ID : 007765.12
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 001576 |( )
|THE LANE CONSTRUCTION CORP. |THE MILLER GROUP, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0300 618.1401 880.000 UN | 14.00000 12320.00| 20.00000 17600.00|
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0310 618.1411 10.000 UN | 40.00000 400.00| 20.00000 200.00|
SEEDING METHOD NUMBER 3 - PLAN QUANTITY | | |
0320 619.1201 890.000 UN | 7.00000 6230.00| 8.75000 7787.50|
MULCH - PLAN QUANTITY | | |
0330 620.58 780.000 M2 | 3.00000 2340.00| 2.69000 2098.20|
EROSION CONTROL GEOTEXTILE | | |
0340 627.76 LUMP| 10000.00000 10000.00| 5625.00000 5625.00|
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0350 629.05 30.000 MH | 25.00000 750.00| 31.25000 937.50|
HAND LABOR, STRAIGHT TIME | | |
0360 631.11 20.000 HR | 20.00000 400.00| 31.25000 625.00|
AIR TOOL (INCLUDING OPERATOR) | | |
0370 631.12 10.000 HR | 90.00000 900.00| 112.50000 1125.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0380 631.14 10.000 HR | 100.00000 1000.00| 125.00000 1250.00|
GRADER (INCLUDING OPERATOR) | | |
0390 631.172 10.000 HR | 45.00000 450.00| 56.25000 562.50|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0400 631.18 30.000 HR | 35.00000 1050.00| 37.50000 1125.00|
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0410 631.32 12.000 HR | 125.00000 1500.00| 143.75000 1725.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0420 639.18 1.000 EA | 5500.00000 5500.00| 5000.00000 5000.00|
FIELD OFFICE TYPE A | | |
0430 652.31 50.000 EA | 150.00000 7500.00| 37.50000 1875.00|
TYPE I BARRICADE | | |
0440 652.33 55.000 EA | 50.00000 2750.00| 43.75000 2406.25|
DRUM | | |
0450 652.34 80.000 EA | 15.00000 1200.00| 22.50000 1800.00|
CONE | | |
0460 652.35 140.000 M2 | 95.00000 13300.00| 112.50000 15750.00|
CONSTRUCTION SIGNS | | |
0470 652.36 120.000 CD | 150.00000 22950.00| 187.50000 28687.50|
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0480 652.38 3530.000 MH | 15.00000 54000.00| 18.75000 67500.00|
FLAGGER | | |
0490 656.75 LUMP| 28000.00000 28000.00| 31250.00000 31250.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
LETTING DATE : 04/10/02 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/10/02
PAGE : 4
LOCATION : TABULATION OF BIDS
CONTRACT ID : 007765.12
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 001576 |( )
|THE LANE CONSTRUCTION CORP. |THE MILLER GROUP, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0500 659.10 LUMP| 70000.00000 70000.00| 75000.00000 75000.00|
MOBILIZATION | | |
SECTION TOTALS | $ 1,842,550.26| $ 1,992,034.34| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 1,842,550.26| $ 1,992,034.34| $
====================================================================================================================================