LETTING DATE : 04/09/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 04/09/03
PAGE : 1
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 010570.00 COMPLETION DATE : 08/30/03
=========
PROJECT(S): STP-A057(000)X LOCATION(S): PRESQUE ISLE MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1210(000)X PRESQUE ISLE
A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : LEVEL 2 NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 THE LANE CONSTRUCTION CORP. $ 971,624.79 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.203 210.000 M2 | 11.00000 2310.00| |
PAVEMENT BUTT JOINTS | | |
0020 205.51 300.000 M2 | 10.00000 3000.00| |
WIDENING OF EXISTING SHOULDER | | |
0030 211.20 2450.000 M | 10.00000 24500.00| |
INSLOPE EXCAVATION | | |
0040 211.30 4090.000 M | 11.00000 44990.00| |
DITCH EXCAVATION | | |
0050 304.103 100.000 M3 | 20.00000 2000.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0060 309.30 28050.000 M2 | 6.40000 179520.00| |
FULL DEPTH RECYCLED PAVEMENT WITH FOAM | | |
ASPHALT | | |
0070 309.31 16040.000 M2 | 5.60000 89824.00| |
FULL DEPTH RECYCLED PAVEMENT WITH FOAM | | |
ASPHALT (SHOULDER) | | |
0080 403.209 110.000 MG | 100.00000 11000.00| |
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0090 403.210 5910.000 MG | 46.80000 276588.00| |
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0100 409.15 6330.000 L | 1.50000 9495.00| |
BITUMINOUS TACK COAT APPLIED | | |
0110 411.10 830.000 M3 | 30.00000 24900.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
LETTING DATE : 04/09/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 04/09/03
PAGE : 2
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 010570.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 411.12 10.000 MG | 40.00000 400.00| |
CRUSHED STONE SURFACE | | |
0130 603.16 9.750 M | 110.00000 1072.50| |
375 MM CULVERT PIPE OPTION I | | |
0140 603.17 41.450 M | 130.00000 5388.50| |
450 MM CULVERT PIPE OPTION I | | |
0150 603.199 40.240 M | 160.00000 6438.40| |
600 MM CULVERT PIPE OPTION III | | |
0160 603.20 18.290 M | 170.00000 3109.30| |
750 MM CULVERT PIPE OPTION I | | |
0170 603.209 21.950 M | 185.00000 4060.75| |
750 MM CULVERT PIPE OPTION III | | |
0180 603.219 21.950 M | 250.00000 5487.50| |
900 MM CULVERT PIPE OPTION III | | |
0190 603.736 4.270 M | 300.00000 1281.00| |
REMOVE AND RELAY 1500 MM METAL PIPE | | |
0200 606.17 925.830 M | 47.00000 43514.01| |
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0210 606.22 26.670 M | 49.00000 1306.83| |
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0220 606.265 4.000 EA | 58.00000 232.00| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0230 606.35 32.000 EA | 38.00000 1216.00| |
GUARDRAIL DELINEATOR POST | | |
0240 606.752 12.000 EA | 1000.00000 12000.00| |
WIDEN SHOULDER FOR MODIFIED ECCENTRIC | | |
LOADER TERMINAL | | |
0250 606.76 12.000 EA | 1600.00000 19200.00| |
MODIFIED ECCENTRIC LOADER TERMINAL | | |
0260 609.38 21.000 M | 50.00000 1050.00| |
RESET CURB TYPE 1 | | |
0270 610.08 30.000 M3 | 50.00000 1500.00| |
PLAIN RIPRAP | | |
0280 613.319 4990.000 M2 | 1.90000 9481.00| |
EROSION CONTROL BLANKET | | |
0290 615.07 120.000 M3 | 30.00000 3600.00| |
LOAM | | |
0300 618.1301 47.000 UN | 30.00000 1410.00| |
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0310 618.1401 297.000 UN | 15.00000 4455.00| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
LETTING DATE : 04/09/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 04/09/03
PAGE : 3
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 010570.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0320 619.1201 344.000 UN | 10.00000 3440.00| |
MULCH - PLAN QUANTITY | | |
0330 620.58 90.000 M2 | 4.50000 405.00| |
EROSION CONTROL GEOTEXTILE | | |
0340 627.76 LUMP| 4000.00000 4000.00| |
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0350 629.05 5.000 HR | 26.00000 130.00| |
HAND LABOR, STRAIGHT TIME | | |
0360 631.10 5.000 HR | 40.00000 200.00| |
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0370 631.11 5.000 HR | 35.00000 175.00| |
AIR TOOL (INCLUDING OPERATOR) | | |
0380 631.12 10.000 HR | 100.00000 1000.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0390 631.14 20.000 HR | 90.00000 1800.00| |
GRADER (INCLUDING OPERATOR) | | |
0400 631.172 10.000 HR | 55.00000 550.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0410 631.18 5.000 HR | 35.00000 175.00| |
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0420 631.32 10.000 HR | 130.00000 1300.00| |
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0430 639.19 1.000 EA | 8500.00000 8500.00| |
FIELD OFFICE TYPE B | | |
0440 652.31 32.000 EA | 50.00000 1600.00| |
TYPE I BARRICADE | | |
0450 652.33 32.000 EA | 60.00000 1920.00| |
DRUM | | |
0460 652.34 40.000 EA | 20.00000 800.00| |
CONE | | |
0470 652.35 70.000 M2 | 110.00000 7700.00| |
CONSTRUCTION SIGNS | | |
0480 652.36 100.000 CD | 200.00000 20000.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0490 652.38 1440.000 HR | 15.00000 21600.00| |
FLAGGER | | |
0500 656.75 LUMP| 20000.00000 20000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
LETTING DATE : 04/09/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 04/09/03
PAGE : 4
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 010570.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0510 659.10 LUMP| 82000.00000 82000.00| |
MOBILIZATION | | |
SECTION TOTALS | $ 971,624.79| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 971,624.79| $ | $
====================================================================================================================================