Skip Maine state header navigation
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 1
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20 COMPLETION DATE : 09/30/03
=========
PROJECT(S): STP-2678(20)X LOCATION(S): KENDUSKEAG MAINE STATE DEPARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : RURAL HIGHWAY CONSTRUCTION NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 THE LANE CONSTRUCTION CORP. $ 867,808.50 100.0000%
2 000649 SARGENT & SARGENT, INC. $ 974,362.50 112.2785%
3 000014 FARRIN BROS. & SMITH, INC. $ 1,033,333.33 119.0739%
4 000529 BARRETT PAVING MATERIALS, INC. $ 1,112,647.40 128.2135%
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 000649 |( 3 ) 000014
|THE LANE CONSTRUCTION CORP. |SARGENT & SARGENT, INC. |FARRIN BROS. & SMITH, INC.
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 201.11 0.400 HA | 10000.00000 4000.00| 5000.00000 2000.00| 18000.00000 7200.00
CLEARING | | |
0020 201.23 8.000 EA | 300.00000 2400.00| 250.00000 2000.00| 300.00000 2400.00
REMOVING SINGLE TREE TOP ONLY | | |
0030 201.24 8.000 EA | 90.00000 720.00| 250.00000 2000.00| 200.00000 1600.00
REMOVING STUMP | | |
0040 202.202 4520.000 M2 | 1.50000 6780.00| 2.00000 9040.00| 2.90000 13108.00
REMOVING PAVEMENT SURFACE | | |
0050 203.20 15000.000 M3 | 10.00000 150000.00| 10.00000 150000.00| 15.00000 225000.00
COMMON EXCAVATION | | |
0060 203.25 50.000 M3 | 27.00000 1350.00| 20.00000 1000.00| 22.75000 1137.50
GRANULAR BORROW | | |
0070 206.061 25.000 M3 | 33.00000 825.00| 24.00000 600.00| 20.00000 500.00
STRUCTURAL EARTH EXCAVATION - DRAINAGE | | |
AND MINOR STRUCTURES, BELOW GRADE | | |
0080 304.10 11400.000 M3 | 17.00000 193800.00| 14.00000 159600.00| 23.00000 262200.00
AGGREGATE SUBBASE COURSE - GRAVEL | | |
0090 403.208 1620.000 MG | 41.50000 67230.00| 41.50000 67230.00| 41.00000 66420.00
HOT MIX ASPHALT 12.5 MM, SURFACE | | |
0100 403.209 185.000 MG | 95.00000 17575.00| 95.00000 17575.00| 100.00000 18500.00
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 2
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 000649 |( 3 ) 000014
|THE LANE CONSTRUCTION CORP. |SARGENT & SARGENT, INC. |FARRIN BROS. & SMITH, INC.
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0110 403.213 2900.000 MG | 41.50000 120350.00| 41.50000 120350.00| 41.00000 118900.00
HOT MIX ASPHALT 12.5 MM, BASE | | |
0120 409.15 1360.000 L | 1.20000 1632.00| 1.20000 1632.00| 0.50000 680.00
BITUMINOUS TACK COAT APPLIED | | |
0130 411.10 40.000 M3 | 50.00000 2000.00| 24.00000 960.00| 60.00000 2400.00
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0140 603.05 4.000 M | 150.00000 600.00| 100.00000 400.00| 100.00000 400.00
150 MM PVC DRAIN SERVICE | | |
0150 603.159 27.000 M | 127.00000 3429.00| 100.00000 2700.00| 200.00000 5400.00
300 MM CULVERT PIPE OPTION III | | |
0160 603.16 9.000 M | 100.00000 900.00| 100.00000 900.00| 90.00000 810.00
375 MM CULVERT PIPE OPTION I | | |
0170 603.179 57.000 M | 133.00000 7581.00| 120.00000 6840.00| 185.00000 10545.00
450 MM CULVERT PIPE OPTION III | | |
0180 603.189 17.000 M | 145.00000 2465.00| 150.00000 2550.00| 200.00000 3400.00
525 MM CULVERT PIPE OPTION III | | |
0190 604.092 4.000 EA | 1400.00000 5600.00| 2400.00000 9600.00| 1600.00000 6400.00
CATCH BASIN TYPE B1-C | | |
0200 604.15 1.000 EA | 1280.00000 1280.00| 2600.00000 2600.00| 1600.00000 1600.00
MANHOLE | | |
0210 604.242 1.000 EA | 800.00000 800.00| 1500.00000 1500.00| 1200.00000 1200.00
CATCH BASIN TYPE F3 | | |
0220 605.09 770.000 M | 78.00000 60060.00| 80.00000 61600.00| 62.00000 47740.00
150 MM UNDERDRAIN TYPE B | | |
0230 605.10 32.000 M | 78.00000 2496.00| 80.00000 2560.00| 60.00000 1920.00
150 MM UNDERDRAIN OUTLET | | |
0240 605.11 65.000 M | 118.00000 7670.00| 100.00000 6500.00| 85.00000 5525.00
300 MM UNDERDRAIN TYPE C | | |
0250 606.265 1.000 EA | 43.50000 43.50| 43.50000 43.50| 60.00000 60.00
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0260 606.35 9.000 EA | 32.00000 288.00| 32.00000 288.00| 25.00000 225.00
GUARDRAIL DELINEATOR POST | | |
0270 606.47 25.000 EA | 33.00000 825.00| 33.00000 825.00| 35.00000 875.00
SINGLE WOOD POST | | |
0280 606.55 309.000 M | 31.00000 9579.00| 31.00000 9579.00| 31.00000 9579.00
GUARDRAIL TYPE 3 - SINGLE RAIL | | |
0290 606.59 8.000 M | 49.00000 392.00| 49.00000 392.00| 34.28000 274.24
GUARDRAIL TYPE 3 - 4.5 M RADIUS AND LES | | |
0300 606.76 3.000 EA | 1480.00000 4440.00| 1480.00000 4440.00| 1500.00000 4500.00
MODIFIED ECCENTRIC LOADER TERMINAL | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 3
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 000649 |( 3 ) 000014
|THE LANE CONSTRUCTION CORP. |SARGENT & SARGENT, INC. |FARRIN BROS. & SMITH, INC.
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 607.25 51.000 M | 17.00000 867.00| 17.00000 867.00| 32.68000 1666.68
REMOVE AND RESET CHAIN LINK FENCE | | |
0320 609.31 420.000 M | 16.00000 6720.00| 16.00000 6720.00| 12.00000 5040.00
CURB TYPE 3 | | |
0330 610.08 30.000 M3 | 70.00000 2100.00| 50.00000 1500.00| 60.00000 1800.00
PLAIN RIPRAP | | |
0340 612.06 140.000 M2 | 6.00000 840.00| 6.00000 840.00| 3.00000 420.00
BITUMINOUS SEALING - BLACK | | |
0350 613.319 500.000 M2 | 2.00000 1000.00| 2.00000 1000.00| 1.75000 875.00
EROSION CONTROL BLANKET | | |
0360 615.07 1000.000 M3 | 21.00000 21000.00| 8.00000 8000.00| 22.00000 22000.00
LOAM | | |
0370 618.1301 35.000 UN | 19.00000 665.00| 24.00000 840.00| 19.00000 665.00
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0380 618.1401 108.000 UN | 15.00000 1620.00| 12.00000 1296.00| 15.00000 1620.00
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0390 618.1411 21.000 UN | 30.00000 630.00| 38.00000 798.00| 30.00000 630.00
SEEDING METHOD NUMBER 3 - PLAN QUANTITY | | |
0400 619.1201 165.000 UN | 6.40000 1056.00| 7.00000 1155.00| 6.40000 1056.00
MULCH - PLAN QUANTITY | | |
0410 619.1401 20.000 M3 | 50.00000 1000.00| 40.00000 800.00| 50.00000 1000.00
EROSION CONTROL MIX | | |
0420 620.54 2200.000 M2 | 2.00000 4400.00| 1.00000 2200.00| 3.50000 7700.00
STABILIZATION GEOTEXTILE | | |
0430 620.58 50.000 M2 | 4.00000 200.00| 2.00000 100.00| 5.00000 250.00
EROSION CONTROL GEOTEXTILE | | |
0440 621.037 10.000 EA | 108.00000 1080.00| 160.00000 1600.00| 108.00000 1080.00
EVERGREEN TREES (1500 MM - 1800 MM) | | |
GROUP A | | |
0450 621.267 12.000 EA | 279.00000 3348.00| 270.00000 3240.00| 279.00000 3348.00
LARGE DECIDUOUS TREE (45 MM - 50 MM | | |
CALIPER) GROUP A | | |
0460 627.711 4200.000 M | 0.50000 2100.00| 0.50000 2100.00| 0.50000 2100.00
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY ) | | |
0470 627.75 14.000 M2 | 43.00000 602.00| 43.00000 602.00| 13.50000 189.00
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
0480 627.76 LUMP| 2200.00000 2200.00| 2200.00000 2200.00| 2500.00000 2500.00
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 4
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 000649 |( 3 ) 000014
|THE LANE CONSTRUCTION CORP. |SARGENT & SARGENT, INC. |FARRIN BROS. & SMITH, INC.
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0490 629.05 5.000 HR | 25.00000 125.00| 24.00000 120.00| 30.00000 150.00
HAND LABOR, STRAIGHT TIME | | |
0500 631.10 5.000 HR | 50.00000 250.00| 30.00000 150.00| 20.00000 100.00
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0510 631.11 5.000 HR | 20.00000 100.00| 32.00000 160.00| 20.00000 100.00
AIR TOOL (INCLUDING OPERATOR) | | |
0520 631.12 5.000 HR | 100.00000 500.00| 100.00000 500.00| 90.00000 450.00
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0530 631.13 5.000 HR | 70.00000 350.00| 100.00000 500.00| 50.00000 250.00
BULLDOZER (INCLUDING OPERATOR) | | |
0540 631.172 5.000 HR | 45.00000 225.00| 48.00000 240.00| 45.00000 225.00
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0550 631.22 5.000 HR | 70.00000 350.00| 90.00000 450.00| 40.00000 200.00
FRONT END LOADER (INCLUDING OPERATOR) | | |
0560 631.32 2.000 HR | 100.00000 200.00| 125.00000 250.00| 300.00000 600.00
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0570 637.071 LUMP| 7000.00000 7000.00| 50000.00000 50000.00| 20000.00000 20000.00
DUST CONTROL | | |
0580 639.18 1.000 EA | 6000.00000 6000.00| 7500.00000 7500.00| 8000.00000 8000.00
FIELD OFFICE TYPE A | | |
0590 652.31 30.000 EA | 50.00000 1500.00| 75.00000 2250.00| 10.00000 300.00
TYPE I BARRICADE | | |
0600 652.311 20.000 EA | 50.00000 1000.00| 100.00000 2000.00| 10.00000 200.00
TYPE II BARRICADE | | |
0610 652.33 30.000 EA | 55.00000 1650.00| 75.00000 2250.00| 50.00000 1500.00
DRUM | | |
0620 652.34 50.000 EA | 15.00000 750.00| 20.00000 1000.00| 15.00000 750.00
CONE | | |
0630 652.35 30.000 M2 | 70.00000 2100.00| 120.00000 3600.00| 85.00000 2550.00
CONSTRUCTION SIGNS | | |
0640 652.361 140.000 LS | 15000.00000 15000.00| 40000.00000 40000.00| 1000.00000 1000.00
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0650 652.38 3000.000 HR | 14.00000 42000.00| 12.00000 36000.00| 15.00000 45000.00
FLAGGER | | |
0660 653.22 92.000 M2 | 15.00000 1380.00| 10.00000 920.00| 30.00000 2760.00
50 MM POLYSTYRENE PLASTIC INSULATION | | |
0670 656.75 LUMP| 10000.00000 10000.00| 42300.00000 42300.00| 20000.00000 20000.00
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0680 657.24 100.000 UN | 12.00000 1200.00| 10.00000 1000.00| 10.90000 1090.00
SEEDING PITS | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 5
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 1 ) 000022 |( 2 ) 000649 |( 3 ) 000014
|THE LANE CONSTRUCTION CORP. |SARGENT & SARGENT, INC. |FARRIN BROS. & SMITH, INC.
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0690 658.20 20.000 M2 | 29.50000 590.00| 30.00000 600.00| 19.75000 395.00
ACRYLIC LATEX COLOR FINISH, GREEN | | |
0700 659.10 LUMP| 46000.00000 46000.00| 97410.00000 97410.00| 50274.91000 50274.91
MOBILIZATION | | |
0710 660.21 1000.000 HR | 1.00000 1000.00| 2.00000 2000.00| 3.00000 3000.00
ON-THE-JOB TRAINING (BID) | | |
SECTION TOTALS | $ 867,808.50| $ 974,362.50| $ 1,033,333.33
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 867,808.50| $ 974,362.50| $ 1,033,333.33
====================================================================================================================================
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 6
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 4 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 201.11 0.400 HA | 8600.00000 3440.00| |
CLEARING | | |
0020 201.23 8.000 EA | 338.00000 2704.00| |
REMOVING SINGLE TREE TOP ONLY | | |
0030 201.24 8.000 EA | 338.00000 2704.00| |
REMOVING STUMP | | |
0040 202.202 4520.000 M2 | 2.30000 10396.00| |
REMOVING PAVEMENT SURFACE | | |
0050 203.20 15000.000 M3 | 11.25000 168750.00| |
COMMON EXCAVATION | | |
0060 203.25 50.000 M3 | 22.50000 1125.00| |
GRANULAR BORROW | | |
0070 206.061 25.000 M3 | 27.00000 675.00| |
STRUCTURAL EARTH EXCAVATION - DRAINAGE | | |
AND MINOR STRUCTURES, BELOW GRADE | | |
0080 304.10 11400.000 M3 | 15.75000 179550.00| |
AGGREGATE SUBBASE COURSE - GRAVEL | | |
0090 403.208 1620.000 MG | 50.60000 81972.00| |
HOT MIX ASPHALT 12.5 MM, SURFACE | | |
0100 403.209 185.000 MG | 116.00000 21460.00| |
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0110 403.213 2900.000 MG | 48.15000 139635.00| |
HOT MIX ASPHALT 12.5 MM, BASE | | |
0120 409.15 1360.000 L | 0.45000 612.00| |
BITUMINOUS TACK COAT APPLIED | | |
0130 411.10 40.000 M3 | 27.00000 1080.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0140 603.05 4.000 M | 113.00000 452.00| |
150 MM PVC DRAIN SERVICE | | |
0150 603.159 27.000 M | 113.00000 3051.00| |
300 MM CULVERT PIPE OPTION III | | |
0160 603.16 9.000 M | 113.00000 1017.00| |
375 MM CULVERT PIPE OPTION I | | |
0170 603.179 57.000 M | 169.00000 9633.00| |
450 MM CULVERT PIPE OPTION III | | |
0180 603.189 17.000 M | 169.00000 2873.00| |
525 MM CULVERT PIPE OPTION III | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 7
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 4 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0190 604.092 4.000 EA | 2700.00000 10800.00| |
CATCH BASIN TYPE B1-C | | |
0200 604.15 1.000 EA | 2900.00000 2900.00| |
MANHOLE | | |
0210 604.242 1.000 EA | 1700.00000 1700.00| |
CATCH BASIN TYPE F3 | | |
0220 605.09 770.000 M | 90.00000 69300.00| |
150 MM UNDERDRAIN TYPE B | | |
0230 605.10 32.000 M | 90.00000 2880.00| |
150 MM UNDERDRAIN OUTLET | | |
0240 605.11 65.000 M | 113.00000 7345.00| |
300 MM UNDERDRAIN TYPE C | | |
0250 606.265 1.000 EA | 67.50000 67.50| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0260 606.35 9.000 EA | 28.15000 253.35| |
GUARDRAIL DELINEATOR POST | | |
0270 606.47 25.000 EA | 39.40000 985.00| |
SINGLE WOOD POST | | |
0280 606.55 309.000 M | 34.90000 10784.10| |
GUARDRAIL TYPE 3 - SINGLE RAIL | | |
0290 606.59 8.000 M | 38.55000 308.40| |
GUARDRAIL TYPE 3 - 4.5 M RADIUS AND LES | | |
0300 606.76 3.000 EA | 1700.00000 5100.00| |
MODIFIED ECCENTRIC LOADER TERMINAL | | |
0310 607.25 51.000 M | 36.75000 1874.25| |
REMOVE AND RESET CHAIN LINK FENCE | | |
0320 609.31 420.000 M | 14.55000 6111.00| |
CURB TYPE 3 | | |
0330 610.08 30.000 M3 | 56.25000 1687.50| |
PLAIN RIPRAP | | |
0340 612.06 140.000 M2 | 23.95000 3353.00| |
BITUMINOUS SEALING - BLACK | | |
0350 613.319 500.000 M2 | 1.15000 575.00| |
EROSION CONTROL BLANKET | | |
0360 615.07 1000.000 M3 | 9.00000 9000.00| |
LOAM | | |
0370 618.1301 35.000 UN | 21.40000 749.00| |
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0380 618.1401 108.000 UN | 16.90000 1825.20| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 8
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 4 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0390 618.1411 21.000 UN | 33.75000 708.75| |
SEEDING METHOD NUMBER 3 - PLAN QUANTITY | | |
0400 619.1201 165.000 UN | 7.20000 1188.00| |
MULCH - PLAN QUANTITY | | |
0410 619.1401 20.000 M3 | 45.00000 900.00| |
EROSION CONTROL MIX | | |
0420 620.54 2200.000 M2 | 1.15000 2530.00| |
STABILIZATION GEOTEXTILE | | |
0430 620.58 50.000 M2 | 2.25000 112.50| |
EROSION CONTROL GEOTEXTILE | | |
0440 621.037 10.000 EA | 122.00000 1220.00| |
EVERGREEN TREES (1500 MM - 1800 MM) | | |
GROUP A | | |
0450 621.267 12.000 EA | 314.00000 3768.00| |
LARGE DECIDUOUS TREE (45 MM - 50 MM | | |
CALIPER) GROUP A | | |
0460 627.711 4200.000 M | 0.55000 2310.00| |
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY ) | | |
0470 627.75 14.000 M2 | 48.40000 677.60| |
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
0480 627.76 LUMP| 2500.00000 2500.00| |
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0490 629.05 5.000 HR | 27.00000 135.00| |
HAND LABOR, STRAIGHT TIME | | |
0500 631.10 5.000 HR | 33.75000 168.75| |
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0510 631.11 5.000 HR | 36.00000 180.00| |
AIR TOOL (INCLUDING OPERATOR) | | |
0520 631.12 5.000 HR | 113.00000 565.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0530 631.13 5.000 HR | 113.00000 565.00| |
BULLDOZER (INCLUDING OPERATOR) | | |
0540 631.172 5.000 HR | 54.00000 270.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0550 631.22 5.000 HR | 101.00000 505.00| |
FRONT END LOADER (INCLUDING OPERATOR) | | |
0560 631.32 2.000 HR | 141.00000 282.00| |
CULVERT CLEANER (INCLUDING OPERATOR) | | |
LETTING DATE : 03/12/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/12/03
PAGE : 9
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 002678.20
=========
====================================================================================================================================
|( 4 ) 000529 |( ) |( )
|BARRETT PAVING MATERIALS, I | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0570 637.071 LUMP| 39000.00000 39000.00| |
DUST CONTROL | | |
0580 639.18 1.000 EA | 6000.00000 6000.00| |
FIELD OFFICE TYPE A | | |
0590 652.31 30.000 EA | 112.00000 3360.00| |
TYPE I BARRICADE | | |
0600 652.311 20.000 EA | 81.25000 1625.00| |
TYPE II BARRICADE | | |
0610 652.33 30.000 EA | 55.10000 1653.00| |
DRUM | | |
0620 652.34 50.000 EA | 16.05000 802.50| |
CONE | | |
0630 652.35 30.000 M2 | 239.00000 7170.00| |
CONSTRUCTION SIGNS | | |
0640 652.361 140.000 LS | 28000.00000 28000.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0650 652.38 3000.000 HR | 15.20000 45600.00| |
FLAGGER | | |
0660 653.22 92.000 M2 | 11.25000 1035.00| |
50 MM POLYSTYRENE PLASTIC INSULATION | | |
0670 656.75 LUMP| 51000.00000 51000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0680 657.24 100.000 UN | 12.25000 1225.00| |
SEEDING PITS | | |
0690 658.20 20.000 M2 | 33.20000 664.00| |
ACRYLIC LATEX COLOR FINISH, GREEN | | |
0700 659.10 LUMP| 134000.00000 134000.00| |
MOBILIZATION | | |
0710 660.21 1000.000 HR | 4.20000 4200.00| |
ON-THE-JOB TRAINING (BID) | | |
SECTION TOTALS | $ 1,112,647.40| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 1,112,647.40| $ 0.00| $
====================================================================================================================================