Skip Maine state header navigation
LETTING DATE : 06/25/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 06/25/03
PAGE : 1
COUNTIE(S): FRANKLIN TABULATION OF BIDS
CONTRACT ID : 004329.40 COMPLETION DATE : 08/30/03
=========
PROJECT(S): NH-4329(40)E LOCATION(S): PHILLIPS MAINE STATE DEPARTMENT OF TRANSPORTATION A TRUE COPY : __________________________ TITLE : __________________________ ATTEST : ____________________________ CONTRACT DESCRIPTION : WETLAND MITIGATION NOTARY PUBLIC --------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 001290 GORDON DAVIS $ 177,802.00 100.0000%
====================================================================================================================================
|( 1 ) 001290 |( ) |( )
|GORDON DAVIS | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 MITIGATION ITEMS
| | |
0010 201.11 0.250 AC | 3800.00000 950.00| |
CLEARING | | |
0020 203.20 780.000 CY | 11.00000 8580.00| |
COMMON EXCAVATION | | |
0030 203.25 60.000 CY | 25.00000 1500.00| |
GRANULAR BORROW | | |
0040 203.26 50.000 CY | 29.00000 1450.00| |
GRAVEL BORROW | | |
0050 603.911 40.000 LF | 490.00000 19600.00| |
60" X 38" RCP ELLIPTICAI CULVERT PIPE | | |
0060 606.17 75.000 LF | 15.00000 1125.00| |
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0070 606.35 4.000 EA | 35.00000 140.00| |
GUARDRAIL DELINEATOR POST | | |
0080 606.78 4.000 EA | 95.00000 380.00| |
LOW VOLUME GUARDRAIL ENDS - TYPE 3 | | |
0090 610.09 32.000 CY | 85.00000 2720.00| |
HAND LAID RIPRAP - CULVERT PROTECTION | | |
0100 610.10 105.000 CY | 67.00000 7035.00| |
VEGETATED RIPRAP | | |
0110 610.18 30.000 CY | 50.00000 1500.00| |
STONE DITCH PROTECTION | | |
0120 610.21 45.000 CY | 53.00000 2385.00| |
RIVER STONES - RIFFLES | | |
0130 615.07 145.000 CY | 34.00000 4930.00| |
LOAM | | |
LETTING DATE : 06/25/03 MAINE DEPARTMENT OF TRANSPORTATION DATE : 06/25/03
PAGE : 2
COUNTIE(S): FRANKLIN TABULATION OF BIDS
CONTRACT ID : 004329.40
=========
====================================================================================================================================
|( 1 ) 001290 |( ) |( )
|GORDON DAVIS | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0140 618.1401 14.000 UN | 48.00000 672.00| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0150 619.1201 14.000 UN | 28.00000 392.00| |
MULCH - PLAN QUANTITY | | |
0160 619.1401 125.000 CY | 32.00000 4000.00| |
EROSION CONTROL MIX | | |
0170 620.58 80.000 SY | 4.00000 320.00| |
EROSION CONTROL GEOTEXTILE | | |
0180 621.01 139.000 EA | 14.00000 1946.00| |
EVERGREEN TREES (8 INCH - 12 INCH) | | |
0190 621.245 111.000 EA | 24.00000 2664.00| |
LARGE DECIDUOUS TREES (2 FOOT - 3 FOOT) | | |
GROUP A | | |
0200 621.54 2655.000 EA | 24.00000 63720.00| |
DECIDUOUS SHRUBS (18 INCH - 24 INCH) | | |
GROUP A | | |
0210 621.80 LUMP| 8500.00000 8500.00| |
ESTABLISHMENT PERIOD | | |
0220 629.05 89.000 HR | 35.00000 3115.00| |
HAND LABOR, STRAIGHT TIME | | |
0230 631.12 82.000 HR | 85.00000 6970.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0240 631.172 67.000 HR | 50.00000 3350.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0250 631.18 14.000 HR | 40.00000 560.00| |
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0260 637.071 LUMP| 1900.00000 1900.00| |
DUST CONTROL | | |
0270 652.34 20.000 EA | 26.00000 520.00| |
CONE | | |
0280 652.35 100.000 SF | 10.50000 1050.00| |
CONSTRUCTION SIGNS | | |
0290 652.361 60.000 LS | 1140.00000 1140.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0300 652.38 16.000 HR | 18.00000 288.00| |
FLAGGER | | |
0310 656.75 LUMP| 9400.00000 9400.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0320 659.10 LUMP| 15000.00000 15000.00| |
MOBILIZATION | | |
SECTION TOTALS | $ 177,802.00| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 177,802.00| $ | $
====================================================================================================================================
|