     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 1
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11                                     COMPLETION DATE : 09/30/05
                                                           =========
   PROJECT(S):  STP-1051(611)X          LOCATION(S): BETHEL, PEDESTRIAN/BICYCLE BRIDGEICONSTRUCTIONARTMENT OF TRANSPORTATION
                                                                                   A TRUE COPY : __________________________
                                                                                         TITLE : __________________________
                                                                                        ATTEST : ____________________________
CONTRACT DESCRIPTION :  BETHEL, PEDESTRIAN/BICYCLE BRIDGE CONSTRUCTION                                NOTARY PUBLIC
THE BASIS OF AWARD WILL BE ON SECTION 001
  --------------------------------------------------------------------------------------------------------------------------
                                                                                                   TOTAL         % OVER
  RANK     VENDOR NO./NAME                                                                          BID           LOW BID
  --------------------------------------------------------------------------------------------------------------------------
   1   000032         REED & REED, INC.                                                      $  1,431,092.50     100.0000%
   2   000416         T BUCK CONSTRUCTION INC.                                               $  1,547,707.00     108.1486%
   3   000164         C P M CONSTRUCTORS                                                     $  1,622,341.73     113.3639%
   4   000063         WYMAN & SIMPSON, INC.                                                  $  1,821,547.00     127.2837%
   5   001954         TECHNICAL CONSTRUCTION INC.                                            $  2,040,821.20     142.6058%
====================================================================================================================================
                                          |(   1  ) 000032             |(   2  ) 000416             |(   3  ) 000164
                                          |REED & REED INC.            |T BUCK CONSTRUCTION INC.    |C P M CONSTRUCTORS
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   BRIDGE ITEMS
                                          |                            |                            |
0010 203.20                  270.000  CY  |      12.00000       3240.00|      11.40000       3078.00|      50.00000       13500.00
  COMMON EXCAVATION                       |                            |                            |
0020 203.21                   20.000  CY  |      90.00000       1800.00|     100.00000       2000.00|     130.00000        2600.00
  ROCK EXCAVATION                         |                            |                            |
0030 203.24                 4600.000  CY  |      13.00000      59800.00|       9.50000      43700.00|      16.80000       77280.00
  COMMON BORROW                           |                            |                            |
0040 203.25                  337.000  CY  |      18.00000       6066.00|      17.50000       5897.50|      33.00000       11121.00
  GRANULAR BORROW                         |                            |                            |
0050 206.082                 248.000  CY  |      15.00000       3720.00|      16.00000       3968.00|      20.00000        4960.00
  STRUCTURAL EARTH EXCAVATION - MAJOR     |                            |                            |
  STRUCTURES                              |                            |                            |
0060 206.092                  54.000  CY  |      75.00000       4050.00|     110.00000       5940.00|     100.00000        5400.00
  STRUCTURAL ROCK EXCAVATION - MAJOR      |                            |                            |
  STRUCTURES                              |                            |                            |
0070 206.10                  770.000  CY  |      35.00000      26950.00|       6.95000       5351.50|      41.00000       31570.00
  STRUCTURAL EARTH EXCAVATION - PIERS     |                            |                            |
0080 304.10                  520.000  CY  |      20.00000      10400.00|      20.50000      10660.00|      28.50000       14820.00
  AGGREGATE SUBBASE COURSE - GRAVEL       |                            |                            |
0090 403.210                 130.000  T   |     125.00000      16250.00|     125.00000      16250.00|     140.00000       18200.00
  HOT MIX ASPHALT 9.5 MM HMA              |                            |                            |
0100 501.231                   2.000  EA  |    4000.00000       8000.00|    3000.00000       6000.00|    3500.00000        7000.00
  DYNAMIC LOADING TEST                    |                            |                            |
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 2
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   1  ) 000032             |(   2   ) 000416            |(   3  ) 000164
                                          |REED & REED INC.            |T BUCK CONSTRUCTION INC.    |C P M CONSTRUCTORS
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0110 501.46                 1939.000  LF  |      40.00000      77560.00|      43.00000      83377.00|      40.00000       77560.00
  STEEL H-BEAM PILES 73 LBS/FT, DELIVERED |                            |                            |
0120 501.461                1939.000  LF  |      10.00000      19390.00|       5.00000       9695.00|      10.00000       19390.00
  STEEL H-BEAM PILES 73 LBS/FT, IN PLACE  |                            |                            |
0130 501.90                   34.000  EA  |     130.00000       4420.00|     200.00000       6800.00|     120.00000        4080.00
  PILE TIPS                               |                            |                            |
0140 501.91                   68.000  EA  |      25.00000       1700.00|       1.00000         68.00|       0.01000           0.68
  PILE SPLICES                            |                            |                            |
0150 501.92                           LUMP|   15000.00000      15000.00|   60000.00000      60000.00|   60000.00000       60000.00
  PILE DRIVING EQUIPMENT MOBILIZATION     |                            |                            |
0160 502.21                  134.000  CY  |     525.00000      70350.00|     460.00000      61640.00|     700.00000       93800.00
  STRUCTURAL CONCRETE, ABUTMENTS AND      |                            |                            |
  RETAINING WALLS                         |                            |                            |
0170 502.239                 265.000  LS  |  115000.00000     115000.00|  128600.00000     128600.00|  125000.00000      125000.00
  STRUCTURAL CONCRETE PIERS               |                            |                            |
0180 502.249                 490.000  LS  |   85000.00000      85000.00|   94400.00000      94400.00|   50000.00000       50000.00
  STRUCTURAL CONCRETE PIERS (PLACED UNDER |                            |                            |
  WATER)                                  |                            |                            |
0190 503.12                59735.000  LB  |       0.50000      29867.50|       0.40000      23894.00|       0.50000       29867.50
  REINFORCING STEEL, FABRICATED AND       |                            |                            |
  DELIVERED                               |                            |                            |
0200 503.13                59735.000  LB  |       0.60000      35841.00|       0.52000      31062.20|       0.33000       19712.55
  REINFORCING STEEL, PLACING              |                            |                            |
0210 504.716                          LUMP|  475000.00000     475000.00|  497911.80000     497911.80|  532000.00000      532000.00
  BRIDGE STRUCTURE AND ASSEMBLY           |                            |                            |
0220 511.07                           LUMP|  110000.00000     110000.00|  133500.00000     133500.00|   90000.00000       90000.00
  COFFERDAM: #1                           |                            |                            |
0230 511.07                           LUMP|   90000.00000      90000.00|  126000.00000     126000.00|   90000.00000       90000.00
  COFFERDAM: #2                           |                            |                            |
0240 512.081                  61.000  LS  |    2000.00000       2000.00|    1850.00000       1850.00|    5000.00000        5000.00
  FRENCH DRAINS                           |                            |                            |
0250 514.06                    1.000  EA  |    1000.00000       1000.00|    1200.00000       1200.00|    1000.00000        1000.00
  CURING BOX FOR CONCRETE CYLINDERS       |                            |                            |
0260 515.21                   62.000  LS  |     850.00000        850.00|     400.00000        400.00|     250.00000         250.00
  PROTECTIVE COATING FOR CONCRETE SURFACE |                            |                            |
0270 603.15                    5.000  LF  |     100.00000        500.00|     100.00000        500.00|     120.00000         600.00
  12 INCH CULVERT PIPE OPTION I           |                            |                            |
0280 603.16                  400.000  LF  |      25.00000      10000.00|      31.80000      12720.00|      20.00000        8000.00
  15 INCH CULVERT PIPE OPTION I           |                            |                            |
0290 604.072                   1.000  EA  |    2000.00000       2000.00|    1820.00000       1820.00|    2700.00000        2700.00
  CATCH BASIN TYPE A1-C                   |                            |                            |
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 3
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   1  ) 000032             |(   2   ) 000416            |(   3  ) 000164
                                          |REED & REED INC.            |T BUCK CONSTRUCTION INC.    |C P M CONSTRUCTORS
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0300 604.13                    1.000  EA  |    1800.00000       1800.00|    1620.00000       1620.00|    1200.00000        1200.00
  24 INCH CATCH BASIN TYPE E              |                            |                            |
0310 604.15                    1.000  EA  |    2800.00000       2800.00|    2185.00000       2185.00|    2750.00000        2750.00
  MANHOLE                                 |                            |                            |
0320 607.22                  520.000  LF  |       9.00000       4680.00|       8.80000       4576.00|       9.00000        4680.00
  CEDAR RAIL FENCE                        |                            |                            |
0330 610.08                  580.000  CY  |      50.00000      29000.00|      38.50000      22330.00|      40.00000       23200.00
  PLAIN RIPRAP                            |                            |                            |
0340 615.07                  120.000  CY  |      30.00000       3600.00|      35.00000       4200.00|      44.00000        5280.00
  LOAM                                    |                            |                            |
0350 618.1401                 19.000  UN  |      35.00000        665.00|      35.00000        665.00|      35.00000         665.00
  SEEDING METHOD NUMBER 2 - PLAN QUANTITY |                            |                            |
0360 619.1201                 19.000  UN  |      15.00000        285.00|      15.00000        285.00|      15.00000         285.00
  MULCH - PLAN QUANTITY                   |                            |                            |
0370 629.05                   20.000  HR  |      25.00000        500.00|      35.00000        700.00|      35.00000         700.00
  HAND LABOR, STRAIGHT TIME               |                            |                            |
0380 631.12                   20.000  HR  |      60.00000       1200.00|     105.00000       2100.00|     100.00000        2000.00
  ALL PURPOSE EXCAVATOR (INCLUDING        |                            |                            |
  OPERATOR)                               |                            |                            |
0390 631.171                  20.000  HR  |      40.00000        800.00|      55.00000       1100.00|      40.00000         800.00
  TRUCK - SMALL (INCLUDING OPERATOR)      |                            |                            |
0400 639.18                    1.000  EA  |    7500.00000       7500.00|    9000.00000       9000.00|    5000.00000        5000.00
  FIELD OFFICE TYPE A                     |                            |                            |
0410 652.39                           LUMP|    5000.00000       5000.00|    7000.00000       7000.00|    5000.00000        5000.00
  WORK ZONE TRAFFIC CONTROL               |                            |                            |
0420 656.75                           LUMP|    5000.00000       5000.00|   10000.00000      10000.00|    5000.00000        5000.00
  TEMPORARY SOIL EROSION AND WATER        |                            |                            |
  POLLUTION CONTROL                       |                            |                            |
0430 659.10                           LUMP|   42000.00000      42000.00|   78500.00000      78500.00|  135000.00000      135000.00
  MOBILIZATION                            |                            |                            |
0435 845.10                           LUMP|    6000.00000       6000.00|    9500.00000       9500.00|   10000.00000       10000.00
  STRUCTURAL STEEL UTILITY SUPPORT        |                            |                            |
     SECTION TOTALS                       |             $  1,396,584.50|             $  1,532,044.00|              $  1,596,971.73
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   SPUR PATH  - BID ADDITIVE #1
                                          |                            |                            |
0440 203.20                   48.000  CY  |      36.00000       1728.00|      16.00000        768.00|     100.00000        4800.00
  COMMON EXCAVATION                       |                            |                            |
0450 203.24                  950.000  CY  |      27.00000      25650.00|      10.50000       9975.00|      15.00000       14250.00
  COMMON BORROW                           |                            |                            |
0460 304.10                   80.000  CY  |      40.00000       3200.00|      22.50000       1800.00|      35.00000        2800.00
  AGGREGATE SUBBASE COURSE - GRAVEL       |                            |                            |
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 4
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   1  ) 000032             |(   2   ) 000416            |(   3  ) 000164
                                          |REED & REED INC.            |T BUCK CONSTRUCTION INC.    |C P M CONSTRUCTORS
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0470 403.210                  18.000  T   |     150.00000       2700.00|     125.00000       2250.00|     130.00000        2340.00
  HOT MIX ASPHALT 9.5 MM HMA              |                            |                            |
0480 615.07                   20.000  CY  |      45.00000        900.00|      36.00000        720.00|      50.00000        1000.00
  LOAM                                    |                            |                            |
0490 618.1401                  3.000  UN  |      60.00000        180.00|      35.00000        105.00|      40.00000         120.00
  SEEDING METHOD NUMBER 2 - PLAN QUANTITY |                            |                            |
0500 619.1201                  3.000  UN  |      50.00000        150.00|      15.00000         45.00|      20.00000          60.00
  MULCH - PLAN QUANTITY                   |                            |                            |
     SECTION TOTALS                       |             $     34,508.00|             $     15,663.00|              $     25,370.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  1,431,092.50|             $  1,547,707.00|              $  1,622,341.73
====================================================================================================================================
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 5
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   4  ) 000063             |(   5   ) 001954            |(      )
                                          |WYMAN & SIMPSON, INC.       |TECHNICAL CONSTRUCTION INC. |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   BRIDGE ITEMS
                                          |                            |                            |
0010 203.20                  270.000  CY  |      11.00000       2970.00|      17.00000       4590.00|
  COMMON EXCAVATION                       |                            |                            |
0020 203.21                   20.000  CY  |     125.00000       2500.00|      40.00000        800.00|
  ROCK EXCAVATION                         |                            |                            |
0030 203.24                 4600.000  CY  |      12.70000      58420.00|      13.00000      59800.00|
  COMMON BORROW                           |                            |                            |
0040 203.25                  337.000  CY  |      20.30000       6841.10|      40.00000      13480.00|
  GRANULAR BORROW                         |                            |                            |
0050 206.082                 248.000  CY  |      25.00000       6200.00|      16.00000       3968.00|
  STRUCTURAL EARTH EXCAVATION - MAJOR     |                            |                            |
  STRUCTURES                              |                            |                            |
0060 206.092                  54.000  CY  |     175.00000       9450.00|      60.00000       3240.00|
  STRUCTURAL ROCK EXCAVATION - MAJOR      |                            |                            |
  STRUCTURES                              |                            |                            |
0070 206.10                  770.000  CY  |      40.00000      30800.00|      19.00000      14630.00|
  STRUCTURAL EARTH EXCAVATION - PIERS     |                            |                            |
0080 304.10                  520.000  CY  |      19.00000       9880.00|      19.00000       9880.00|
  AGGREGATE SUBBASE COURSE - GRAVEL       |                            |                            |
0090 403.210                 130.000  T   |     130.00000      16900.00|     120.00000      15600.00|
  HOT MIX ASPHALT 9.5 MM HMA              |                            |                            |
0100 501.231                   2.000  EA  |    4000.00000       8000.00|    3400.00000       6800.00|
  DYNAMIC LOADING TEST                    |                            |                            |
0110 501.46                 1939.000  LF  |      45.00000      87255.00|      49.00000      95011.00|
  STEEL H-BEAM PILES 73 LBS/FT, DELIVERED |                            |                            |
0120 501.461                1939.000  LF  |      10.00000      19390.00|       5.10000       9888.90|
  STEEL H-BEAM PILES 73 LBS/FT, IN PLACE  |                            |                            |
0130 501.90                   34.000  EA  |     300.00000      10200.00|     230.00000       7820.00|
  PILE TIPS                               |                            |                            |
0140 501.91                   68.000  EA  |      40.00000       2720.00|       1.10000         74.80|
  PILE SPLICES                            |                            |                            |
0150 501.92                           LUMP|   15000.00000      15000.00|   17000.00000      17000.00|
  PILE DRIVING EQUIPMENT MOBILIZATION     |                            |                            |
0160 502.21                  134.000  CY  |     458.00000      61372.00|     420.00000      56280.00|
  STRUCTURAL CONCRETE, ABUTMENTS AND      |                            |                            |
  RETAINING WALLS                         |                            |                            |
0170 502.239                 265.000  LS  |  131095.00000     131095.00|  189800.00000     189800.00|
  STRUCTURAL CONCRETE PIERS               |                            |                            |
0180 502.249                 490.000  LS  |  250000.00000     250000.00|   92500.00000      92500.00|
  STRUCTURAL CONCRETE PIERS (PLACED UNDER |                            |                            |
  WATER)                                  |                            |                            |
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 6
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   4  ) 000063             |(   5   ) 001954            |(      )
                                          |WYMAN & SIMPSON, INC.       |TECHNICAL CONSTRUCTION INC. |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0190 503.12                59735.000  LB  |       0.46000      27478.10|       0.50000      29867.50|
  REINFORCING STEEL, FABRICATED AND       |                            |                            |
  DELIVERED                               |                            |                            |
0200 503.13                59735.000  LB  |       0.28000      16725.80|       0.40000      23894.00|
  REINFORCING STEEL, PLACING              |                            |                            |
0210 504.716                          LUMP|  522000.00000     522000.00|  750000.00000     750000.00|
  BRIDGE STRUCTURE AND ASSEMBLY           |                            |                            |
0220 511.07                           LUMP|  120000.00000     120000.00|  166000.00000     166000.00|
  COFFERDAM: #1                           |                            |                            |
0230 511.07                           LUMP|  120000.00000     120000.00|  157600.00000     157600.00|
  COFFERDAM: #2                           |                            |                            |
0240 512.081                  61.000  LS  |    2000.00000       2000.00|    2500.00000       2500.00|
  FRENCH DRAINS                           |                            |                            |
0250 514.06                    1.000  EA  |     600.00000        600.00|    1200.00000       1200.00|
  CURING BOX FOR CONCRETE CYLINDERS       |                            |                            |
0260 515.21                   62.000  LS  |     875.00000        875.00|     840.00000        840.00|
  PROTECTIVE COATING FOR CONCRETE SURFACE |                            |                            |
0270 603.15                    5.000  LF  |      95.00000        475.00|      43.00000        215.00|
  12 INCH CULVERT PIPE OPTION I           |                            |                            |
0280 603.16                  400.000  LF  |      26.00000      10400.00|      30.00000      12000.00|
  15 INCH CULVERT PIPE OPTION I           |                            |                            |
0290 604.072                   1.000  EA  |    1800.00000       1800.00|    1700.00000       1700.00|
  CATCH BASIN TYPE A1-C                   |                            |                            |
0300 604.13                    1.000  EA  |    1250.00000       1250.00|    1100.00000       1100.00|
  24 INCH CATCH BASIN TYPE E              |                            |                            |
0310 604.15                    1.000  EA  |    2300.00000       2300.00|    1700.00000       1700.00|
  MANHOLE                                 |                            |                            |
0320 607.22                  520.000  LF  |       7.35000       3822.00|      10.00000       5200.00|
  CEDAR RAIL FENCE                        |                            |                            |
0330 610.08                  580.000  CY  |      52.50000      30450.00|      56.00000      32480.00|
  PLAIN RIPRAP                            |                            |                            |
0340 615.07                  120.000  CY  |      22.00000       2640.00|      40.00000       4800.00|
  LOAM                                    |                            |                            |
0350 618.1401                 19.000  UN  |      40.00000        760.00|      35.00000        665.00|
  SEEDING METHOD NUMBER 2 - PLAN QUANTITY |                            |                            |
0360 619.1201                 19.000  UN  |      20.00000        380.00|      15.00000        285.00|
  MULCH - PLAN QUANTITY                   |                            |                            |
0370 629.05                   20.000  HR  |      25.00000        500.00|      30.00000        600.00|
  HAND LABOR, STRAIGHT TIME               |                            |                            |
0380 631.12                   20.000  HR  |      85.00000       1700.00|     125.00000       2500.00|
  ALL PURPOSE EXCAVATOR (INCLUDING        |                            |                            |
  OPERATOR)                               |                            |                            |
     LETTING DATE : 12/08/04                     MAINE DEPARTMENT OF TRANSPORTATION                                DATE : 12/08/04
                                                                                                                   PAGE : 7
     COUNTIE(S): OXFORD                                 TABULATION OF BIDS
                                            CONTRACT ID : 010516.11
                                                           =========
====================================================================================================================================
                                          |(   4  ) 000063             |(   5   ) 001954            |(      )
                                          |WYMAN & SIMPSON, INC.       |TECHNICAL CONSTRUCTION INC. |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION            QUANTITY      |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0390 631.171                  20.000  HR  |      35.00000        700.00|      48.00000        960.00|
  TRUCK - SMALL (INCLUDING OPERATOR)      |                            |                            |
0400 639.18                    1.000  EA  |    3500.00000       3500.00|    9000.00000       9000.00|
  FIELD OFFICE TYPE A                     |                            |                            |
0410 652.39                           LUMP|   15000.00000      15000.00|    3400.00000       3400.00|
  WORK ZONE TRAFFIC CONTROL               |                            |                            |
0420 656.75                           LUMP|   11000.00000      11000.00|   12500.00000      12500.00|
  TEMPORARY SOIL EROSION AND WATER        |                            |                            |
  POLLUTION CONTROL                       |                            |                            |
0430 659.10                           LUMP|  169125.00000     169125.00|  180000.00000     180000.00|
  MOBILIZATION                            |                            |                            |
0435 845.10                           LUMP|   10000.00000      10000.00|   18300.00000      18300.00|
  STRUCTURAL STEEL UTILITY SUPPORT        |                            |                            |
     SECTION TOTALS                       |             $  1,804,474.00|             $  2,020,469.20|              $          0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   SPUR PATH  - BID ADDITIVE #1
                                          |                            |                            |
0440 203.20                   48.000  CY  |      11.00000        528.00|      24.00000       1152.00|
  COMMON EXCAVATION                       |                            |                            |
0450 203.24                  950.000  CY  |      12.70000      12065.00|      15.00000      14250.00|
  COMMON BORROW                           |                            |                            |
0460 304.10                   80.000  CY  |      19.00000       1520.00|      23.00000       1840.00|
  AGGREGATE SUBBASE COURSE - GRAVEL       |                            |                            |
0470 403.210                  18.000  T   |     130.00000       2340.00|     120.00000       2160.00|
  HOT MIX ASPHALT 9.5 MM HMA              |                            |                            |
0480 615.07                   20.000  CY  |      22.00000        440.00|      40.00000        800.00|
  LOAM                                    |                            |                            |
0490 618.1401                  3.000  UN  |      40.00000        120.00|      35.00000        105.00|
  SEEDING METHOD NUMBER 2 - PLAN QUANTITY |                            |                            |
0500 619.1201                  3.000  UN  |      20.00000         60.00|      15.00000         45.00|
  MULCH - PLAN QUANTITY                   |                            |                            |
     SECTION TOTALS                       |             $     17,073.00|             $     20,352.00|              $          0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  1,821,547.00|             $  2,040,821.20|              $
====================================================================================================================================