LETTING DATE : 03/24/04 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/24/04
PAGE : 1
COUNTIE(S): OXFORD TABULATION OF BIDS
CONTRACT ID : 011320.00 COMPLETION DATE : 09/03/04
=========
PROJECT(S): STP-A132(000)X LOCATION(S): MEXICO - ROXBURY MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1132(200)X RUMFORD
NH-A144(000)E HANOVER - RUMFORD A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : LEVEL 2 NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000059 PIKE INDUSTRIES, INC. $ 2,629,957.00 100.0000%
2 001253 BRUCE A MANZER, INC. $ 2,999,900.08 114.0665%
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 001253 |( )
|PIKE INDUSTRIES, INC. |BRUCE A MANZER, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.203 2360.000 SY | 20.00000 47200.00| 16.00000 37760.00|
PAVEMENT BUTT JOINTS | | |
0020 203.20 660.000 CY | 10.00000 6600.00| 12.60000 8316.00|
COMMON EXCAVATION | | |
0030 204.41 2738.000 SY | 8.50000 23273.00| 7.30000 19987.40|
REHABILITATION OF EXISTING SHOULDERS, | | |
PLAN QUANTITY | | |
0040 304.10 585.000 CY | 30.00000 17550.00| 20.50000 11992.50|
AGGREGATE SUBBASE COURSE - GRAVEL | | |
0050 403.207 90.000 T | 105.00000 9450.00| 122.50000 11025.00|
HOT MIX ASPHALT 19.0 MM HMA | | |
0060 403.209 275.000 T | 95.00000 26125.00| 102.50000 28187.50|
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS | | |
DRIVES, INCIDENT ALS) | | |
0070 403.210 23825.000 T | 42.75000 1018518.75| 47.49000 1131449.25|
HOT MIX ASPHALT 9.5 MM HMA | | |
0080 403.211 13460.000 T | 42.40000 570704.00| 47.49000 639215.40|
HOT MIX ASPHALT (SHIMMING) | | |
0090 409.15 14780.000 G | 3.75000 55425.00| 3.50000 51730.00|
BITUMINOUS TACK COAT APPLIED | | |
0100 411.10 210.000 CY | 65.00000 13650.00| 52.00000 10920.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0110 603.209 48.000 LF | 230.00000 11040.00| 202.00000 9696.00|
30 INCH CULVERT PIPE OPTION III | | |
LETTING DATE : 03/24/04 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/24/04
PAGE : 2
COUNTIE(S): OXFORD TABULATION OF BIDS
CONTRACT ID : 011320.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 001253 |( )
|PIKE INDUSTRIES, INC. |BRUCE A MANZER, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 604.161 3.000 EA | 500.00000 1500.00| 755.00000 2265.00|
ALTERING CATCH BASIN | | |
0130 604.167 22.000 EA | 425.00000 9350.00| 135.00000 2970.00|
ALTER CATCH BASIN GRATE TO CASCADE | | |
0140 605.09 450.000 LF | 25.00000 11250.00| 30.30000 13635.00|
6 INCH UNDERDRAIN TYPE B | | |
0150 605.10 20.000 LF | 20.00000 400.00| 25.30000 506.00|
6 INCH UNDERDRAIN OUTLET | | |
0160 606.1721 4.000 EA | 1000.00000 4000.00| 1100.00000 4400.00|
BRIDGE TRANSITION - TYPE 1 | | |
0170 606.178 1900.000 LF | 7.50000 14250.00| 6.50000 12350.00|
GUARDRAIL BEAM | | |
0180 606.23 587.500 LF | 15.00000 8812.50| 12.80000 7520.00|
GUARDRAIL TYPE 3C - SINGLE RAIL | | |
0190 606.232 75.000 LF | 17.50000 1312.50| 13.80000 1035.00|
GUARDRAIL TYPE 3C - OVER 15 FOOT RADIUS | | |
0200 606.265 1.000 EA | 50.00000 50.00| 60.00000 60.00|
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0210 606.47 25.000 EA | 35.00000 875.00| 25.00000 625.00|
SINGLE WOOD POST | | |
0220 606.64 325.000 LF | 27.50000 8937.50| 71.14000 23120.50|
GUARDRAIL THRIE BEAM - DOUBLE RAIL | | |
0230 606.754 72.000 EA | 1050.00000 75600.00| 850.00000 61200.00|
WIDEN SHOULDER FOR GUARDRAIL 350 FLARED | | |
TERMINAL | | |
0240 606.79 72.000 EA | 1650.00000 118800.00| 1950.00000 140400.00|
GUARDRAIL 350 FLARED TERMINAL | | |
0250 609.31 2965.000 LF | 8.00000 23720.00| 4.35000 12897.75|
CURB TYPE 3 | | |
0260 610.08 75.000 CY | 75.00000 5625.00| 88.00000 6600.00|
PLAIN RIPRAP | | |
0270 615.07 95.000 CY | 50.00000 4750.00| 46.40000 4408.00|
LOAM | | |
0280 618.1401 362.000 UN | 15.00000 5430.00| 14.00000 5068.00|
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0290 619.1201 362.000 UN | 7.50000 2715.00| 6.50000 2353.00|
MULCH - PLAN QUANTITY | | |
0300 620.54 910.000 SY | 2.75000 2502.50| 1.60000 1456.00|
STABILIZATION GEOTEXTILE | | |
0310 627.76 LUMP| 7500.00000 7500.00| 30000.00000 30000.00|
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
LETTING DATE : 03/24/04 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/24/04
PAGE : 3
COUNTIE(S): OXFORD TABULATION OF BIDS
CONTRACT ID : 011320.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 001253 |( )
|PIKE INDUSTRIES, INC. |BRUCE A MANZER, INC. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0320 629.05 30.000 HR | 45.00000 1350.00| 35.00000 1050.00|
HAND LABOR, STRAIGHT TIME | | |
0330 631.10 10.000 HR | 60.00000 600.00| 75.00000 750.00|
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0340 631.11 10.000 HR | 60.00000 600.00| 75.00000 750.00|
AIR TOOL (INCLUDING OPERATOR) | | |
0350 631.12 40.000 HR | 135.00000 5400.00| 185.00000 7400.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0360 631.172 80.000 HR | 65.00000 5200.00| 80.00000 6400.00|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0370 631.32 50.000 HR | 300.00000 15000.00| 185.00000 9250.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0380 639.19 1.000 EA | 7500.00000 7500.00| 5000.00000 5000.00|
FIELD OFFICE TYPE B | | |
0390 652.33 75.000 EA | 57.75000 4331.25| 60.00000 4500.00|
DRUM | | |
0400 652.34 250.000 EA | 15.75000 3937.50| 21.00000 5250.00|
CONE | | |
0410 652.35 2014.000 SF | 10.00000 20140.00| 12.50000 25175.00|
CONSTRUCTION SIGNS | | |
0420 652.36 122.000 CD | 250.00000 30500.00| 300.00000 36600.00|
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0430 652.38 8415.000 HR | 15.50000 130432.50| 16.00000 134640.00|
FLAGGER | | |
0440 656.75 LUMP| 25000.00000 25000.00| 8000.00000 8000.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0450 659.10 LUMP| 265000.00000 265000.00| 447566.78000 447566.78|
MOBILIZATION | | |
0460 660.21 2000.000 HR | 1.00000 2000.00| 1.90000 3800.00|
ON-THE-JOB TRAINING (BID) | | |
SECTION TOTALS | $ 2,623,907.00| $ 2,989,280.08| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002 SANITARY ITEMS
| | |
0470 812.162 15.000 EA | 350.00000 5250.00| 595.00000 8925.00|
ADJUSTING SEWER MANHOLE TO GRADE | | |
0480 812.164 1.000 EA | 800.00000 800.00| 1695.00000 1695.00|
REBUILDING SEWER MANHOLE | | |
SECTION TOTALS | $ 6,050.00| $ 10,620.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 2,629,957.00| $ 2,999,900.08| $
====================================================================================================================================