Skip Maine state header navigation
LETTING DATE : 05/04/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 05/05/05
PAGE : 1
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 010034.00 COMPLETION DATE : 10/15/05
=========
PROJECT(S): STP-1003(400)X LOCATION(S): OLD TOWN, CENTER STREET MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1134(400)X ORONO
STP-1134(500)X ORONO A TRUE COPY : __________________________
OTHERS OTHERS
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : ORONO & OLD TOWN, HIGHWAY RESURFACING NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 LANE CONSTRUCTION CORP. (THE) $ 1,820,114.00 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (TH | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.202 65450.000 SY | 2.35000 153807.50| |
REMOVING PAVEMENT SURFACE | | |
0020 202.203 3090.000 SY | 12.00000 37080.00| |
PAVEMENT BUTT JOINTS | | |
0030 203.20 1050.000 CY | 20.00000 21000.00| |
COMMON EXCAVATION | | |
0040 304.103 37.000 CY | 38.00000 1406.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0050 310.26 6200.000 SY | 9.90000 61380.00| |
PLANT MIX RECYCLED ASPHALT PAVEMENT - 6 | | |
INCH DEPTH | | |
0060 403.209 422.000 T | 105.00000 44310.00| |
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS | | |
DRIVES, INCIDENT ALS) | | |
0070 403.210 10860.000 T | 50.70000 550602.00| |
HOT MIX ASPHALT 9.5 MM HMA | | |
0080 403.212 4370.000 T | 52.00000 227240.00| |
HOT MIX ASPHALT 4.75 MM HMA | | |
0090 409.15 9200.000 G | 3.00000 27600.00| |
BITUMINOUS TACK COAT APPLIED | | |
0100 411.10 59.000 CY | 70.00000 4130.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0110 603.159 98.000 LF | 50.00000 4900.00| |
12 INCH CULVERT PIPE OPTION III | | |
LETTING DATE : 05/04/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 05/05/05
PAGE : 2
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 010034.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (TH | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 604.161 14.000 EA | 775.00000 10850.00| |
ALTERING CATCH BASIN | | |
0130 604.164 8.000 EA | 3000.00000 24000.00| |
REBUILDING CATCH BASIN | | |
0140 604.167 27.000 EA | 350.00000 9450.00| |
ALTER CATCH BASIN GRATE TO CASCADE | | |
0150 604.18 3.000 EA | 500.00000 1500.00| |
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0160 604.182 95.000 EA | 200.00000 19000.00| |
CLEAN EXISTING CATCH BASIN AND MANHOLE | | |
0170 605.11 80.000 LF | 52.00000 4160.00| |
12 INCH UNDERDRAIN TYPE C | | |
0180 606.23 1150.000 LF | 13.50000 15525.00| |
GUARDRAIL TYPE 3C - SINGLE RAIL | | |
0190 606.231 100.000 LF | 16.00000 1600.00| |
GUARDRAIL TYPE 3C - 15 FOOT RADIUS AND | | |
LESS | | |
0200 606.265 4.000 EA | 28.00000 112.00| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0210 606.35 11.000 EA | 26.00000 286.00| |
GUARDRAIL DELINEATOR POST | | |
0220 606.754 3.000 EA | 2000.00000 6000.00| |
WIDEN SHOULDER FOR GUARDRAIL 350 FLARED | | |
TERMINAL | | |
0230 606.79 11.000 EA | 1400.00000 15400.00| |
GUARDRAIL 350 FLARED TERMINAL | | |
0240 609.31 5444.000 LF | 6.50000 35386.00| |
CURB TYPE 3 | | |
0250 609.38 2756.000 LF | 20.00000 55120.00| |
RESET CURB TYPE 1 | | |
0260 609.441 262.000 LF | 15.00000 3930.00| |
CURBING REMOVED AND STACKED | | |
0270 610.08 10.000 CY | 70.00000 700.00| |
PLAIN RIPRAP | | |
0280 613.319 140.000 SY | 3.40000 476.00| |
EROSION CONTROL BLANKET | | |
0290 615.07 186.000 CY | 45.00000 8370.00| |
LOAM | | |
0300 618.1301 110.000 UN | 21.00000 2310.00| |
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
LETTING DATE : 05/04/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 05/05/05
PAGE : 3
COUNTIE(S): PENOBSCOT TABULATION OF BIDS
CONTRACT ID : 010034.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (TH | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 618.1401 43.000 UN | 16.50000 709.50| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0320 619.1201 153.000 UN | 9.50000 1453.50| |
MULCH - PLAN QUANTITY | | |
0330 627.711 95470.000 LF | 0.15000 14320.50| |
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY) | | |
0340 627.76 LUMP| 7000.00000 7000.00| |
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
0350 629.05 110.000 HR | 25.00000 2750.00| |
HAND LABOR, STRAIGHT TIME | | |
0360 631.12 135.000 HR | 100.00000 13500.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0370 631.172 270.000 HR | 45.00000 12150.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0380 639.19 1.000 EA | 8000.00000 8000.00| |
FIELD OFFICE TYPE B | | |
0390 643.86 16.000 EA | 750.00000 12000.00| |
TRAFFIC SIGNAL LOOP DETECTORS | | |
0400 652.38 2800.000 HR | 13.25000 37100.00| |
FLAGGER | | |
0410 652.39 LUMP| 125000.00000 125000.00| |
WORK ZONE TRAFFIC CONTROL | | |
0420 656.75 LUMP| 10000.00000 10000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0430 659.10 LUMP| 180000.00000 180000.00| |
MOBILIZATION | | |
0440 812.162 85.000 EA | 500.00000 42500.00| |
ADJUSTING SEWER MANHOLE TO GRADE | | |
0450 812.164 2.000 EA | 3000.00000 6000.00| |
REBUILDING SEWER MANHOLE | | |
SECTION TOTALS | $ 1,820,114.00| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 1,820,114.00| $ | $
====================================================================================================================================