Skip Maine state header navigation
LETTING DATE : 06/22/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 06/22/05
PAGE : 1
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011287.00 COMPLETION DATE : 10/22/05
=========
PROJECT(S): STP-1128(700)X LOCATION(S): GARDINER MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1135(500)X PITTSTON
STP-1135(600)X PITTSTON-RANDOLPH A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : GARDINER/PITTSTON/RANDOLPH, HIGHWAY RESURFACING NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000059 PIKE INDUSTRIES, INC. $ 1,269,814.34 100.0000%
====================================================================================================================================
|( 1 ) 000059 |( ) |( )
|PIKE INDUSTRIES, INC. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.202 24250.000 SY | 3.31000 80267.50| |
REMOVING PAVEMENT SURFACE | | |
0020 202.203 1350.000 SY | 19.48000 26298.00| |
PAVEMENT BUTT JOINTS | | |
0030 211.21 620.000 LF | 3.68000 2281.60| |
INSLOPE REHABILITATION | | |
0040 211.30 2175.000 LF | 4.20000 9135.00| |
DITCH EXCAVATION | | |
0050 403.209 220.000 T | 105.00000 23100.00| |
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS | | |
DRIVES, INCIDENT ALS) | | |
0060 403.210 9800.000 T | 47.90000 469420.00| |
HOT MIX ASPHALT 9.5 MM HMA | | |
0070 403.212 3125.000 T | 47.02000 146937.50| |
HOT MIX ASPHALT 4.75 MM HMA | | |
0080 409.15 6360.000 G | 4.05000 25758.00| |
BITUMINOUS TACK COAT APPLIED | | |
0090 411.10 250.000 CY | 35.70000 8925.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0100 604.16 9.000 EA | 588.00000 5292.00| |
ALTERING CATCH BASIN TO MANHOLES | | |
0110 604.164 2.000 EA | 1575.00000 3150.00| |
REBUILDING CATCH BASIN | | |
0120 604.18 3.000 EA | 357.00000 1071.00| |
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
LETTING DATE : 06/22/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 06/22/05
PAGE : 2
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011287.00
=========
====================================================================================================================================
|( 1 ) 000059 |( ) |( )
|PIKE INDUSTRIES, INC. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0130 604.252 1.000 EA | 1785.00000 1785.00| |
CATCH BASIN TYPE A5-C | | |
0140 604.262 2.000 EA | 1575.00000 3150.00| |
CATCH BASIN TYPE B5-C | | |
0150 606.178 200.000 LF | 7.35000 1470.00| |
GUARDRAIL BEAM | | |
0160 606.23 3312.000 LF | 11.92000 39479.04| |
GUARDRAIL TYPE 3C - SINGLE RAIL | | |
0170 606.35 83.000 EA | 26.25000 2178.75| |
GUARDRAIL DELINEATOR POST | | |
0180 606.352 90.000 EA | 2.63000 236.70| |
REFLECTORIZED BEAM GUARDRAIL DELINEATOR | | |
0190 606.357 3937.500 LF | 4.20000 16537.50| |
GUARDRAIL, MODIFY, TYPE 3B | | |
0200 606.47 3.000 EA | 36.75000 110.25| |
SINGLE WOOD POST | | |
0210 606.754 11.000 EA | 1575.00000 17325.00| |
WIDEN SHOULDER FOR GUARDRAIL 350 FLARED | | |
TERMINAL | | |
0220 606.79 35.000 EA | 1260.00000 44100.00| |
GUARDRAIL 350 FLARED TERMINAL | | |
0230 608.26 120.000 SF | 15.75000 1890.00| |
CURB RAMP DETECTABLE WARNING FIELD | | |
0240 608.461 35.000 EA | 315.00000 11025.00| |
RECONSTRUCT PEDESTRIAN RAMP | | |
0250 609.31 1250.000 LF | 7.35000 9187.50| |
CURB TYPE 3 | | |
0260 609.38 100.000 LF | 18.90000 1890.00| |
RESET CURB TYPE 1 | | |
0270 610.08 10.000 CY | 78.75000 787.50| |
PLAIN RIPRAP | | |
0280 613.319 2000.000 SY | 1.84000 3680.00| |
EROSION CONTROL BLANKET | | |
0290 618.1401 125.000 UN | 15.17000 1896.25| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0300 619.1201 125.000 UN | 8.93000 1116.25| |
MULCH - PLAN QUANTITY | | |
0310 627.711 18425.000 LF | 0.16000 2948.00| |
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY) | | |
0320 627.75 150.000 SF | 3.15000 472.50| |
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
LETTING DATE : 06/22/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 06/22/05
PAGE : 3
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011287.00
=========
====================================================================================================================================
|( 1 ) 000059 |( ) |( )
|PIKE INDUSTRIES, INC. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0330 627.76 LUMP| 1328.25000 1328.25| |
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
0340 629.05 30.000 HR | 45.00000 1350.00| |
HAND LABOR, STRAIGHT TIME | | |
0350 631.10 10.000 HR | 68.25000 682.50| |
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0360 631.11 10.000 HR | 68.25000 682.50| |
AIR TOOL (INCLUDING OPERATOR) | | |
0370 631.12 70.000 HR | 135.00000 9450.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0380 631.172 115.000 HR | 65.00000 7475.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0390 639.19 1.000 EA | 12243.00000 12243.00| |
FIELD OFFICE TYPE B | | |
0400 643.86 2.000 EA | 2310.00000 4620.00| |
TRAFFIC SIGNAL LOOP DETECTORS | | |
0410 652.39 LUMP| 118215.14000 118215.14| |
WORK ZONE TRAFFIC CONTROL | | |
0420 656.75 LUMP| 8400.00000 8400.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0430 658.20 55.000 SY | 12.60000 693.00| |
ACRYLIC LATEX COLOR FINISH, GREEN | | |
0440 659.10 LUMP| 126571.86000 126571.86| |
MOBILIZATION | | |
SECTION TOTALS | $ 1,254,612.09| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002 SANITARY ITEMS
| | |
0450 812.162 9.000 EA | 310.25000 2792.25| |
ADJUSTING SEWER MANHOLE TO GRADE | | |
SECTION TOTALS | $ 2,792.25| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003 SANITARY ITEMS
| | |
0460 812.162 40.000 EA | 310.25000 12410.00| |
ADJUSTING SEWER MANHOLE TO GRADE | | |
SECTION TOTALS | $ 12,410.00| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 1,269,814.34| $ | $
====================================================================================================================================