LETTING DATE : 03/09/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/09/05
PAGE : 1
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011290.00
=========
PROJECT(S): STP-A129(000)X LOCATION(S): READFIELD MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1129(100)X READFIELD
STP-1129(400)X WINTHROP A TRUE COPY : __________________________
OTHERS OTHERS
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : READFIELD, ROME, WINTHROP AND WAYNE, HIGHWAY RESURFACING NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000059 PIKE INDUSTRIES, INC. $ 1,173,844.60 100.0000%
2 000004 BLUE ROCK, INDUSTRIES $ 1,894,630.50 161.4039%
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000004 |( )
|PIKE INDUSTRIES, INC. |BLUE ROCK, INDUSTRIES |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 201.11 0.400 AC | 64575.00000 25830.00| 67000.00000 26800.00|
CLEARING | | |
0020 201.23 4.000 EA | 717.50000 2870.00| 740.00000 2960.00|
REMOVING SINGLE TREE TOP ONLY | | |
0030 201.24 6.000 EA | 205.00000 1230.00| 315.00000 1890.00|
REMOVING STUMP | | |
0040 202.202 3400.000 SY | 5.00000 17000.00| 10.00000 34000.00|
REMOVING PAVEMENT SURFACE | | |
0050 202.203 1820.000 SY | 15.43000 28082.60| 35.00000 63700.00|
PAVEMENT BUTT JOINTS | | |
0060 203.242 200.000 CY | 18.45000 3690.00| 26.50000 5300.00|
DIRTY BORROW | | |
0070 204.41 376.000 SY | 7.18000 2699.68| 33.60000 12633.60|
REHABILITATION OF EXISTING SHOULDERS, | | |
PLAN QUANTITY | | |
0080 211.21 18410.000 LF | 2.56000 47129.60| 3.70000 68117.00|
INSLOPE REHABILITATION | | |
0090 211.30 4855.000 LF | 3.08000 14953.40| 4.00000 19420.00|
DITCH EXCAVATION | | |
0100 403.209 170.000 T | 104.00000 17680.00| 152.00000 25840.00|
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS | | |
DRIVES, INCIDENT ALS) | | |
0110 403.210 9605.000 T | 44.00000 422620.00| 56.00000 537880.00|
HOT MIX ASPHALT 9.5 MM HMA | | |
LETTING DATE : 03/09/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/09/05
PAGE : 2
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011290.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000004 |( )
|PIKE INDUSTRIES, INC. |BLUE ROCK, INDUSTRIES |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 403.212 6450.000 T | 43.50000 280575.00| 64.00000 412800.00|
HOT MIX ASPHALT 4.75 MM HMA | | |
0130 403.213 150.000 T | 88.99000 13348.50| 75.00000 11250.00|
HOT MIX ASPHALT 12.5 MM HMA BASE | | |
0140 409.15 8950.000 G | 3.68000 32936.00| 9.00000 80550.00|
BITUMINOUS TACK COAT APPLIED | | |
0150 411.10 190.000 CY | 28.70000 5453.00| 52.50000 9975.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0160 603.16 150.000 LF | 24.60000 3690.00| 30.50000 4575.00|
15 INCH CULVERT PIPE OPTION I | | |
0170 603.17 75.000 LF | 66.63000 4997.25| 46.50000 3487.50|
18 INCH CULVERT PIPE OPTION I | | |
0180 603.239 14.000 LF | 164.00000 2296.00| 683.00000 9562.00|
48 INCH CULVERT PIPE OPTION III | | |
0190 604.18 1.000 EA | 389.50000 389.50| 700.00000 700.00|
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0200 606.23 450.000 LF | 13.79000 6205.50| 15.00000 6750.00|
GUARDRAIL TYPE 3C - SINGLE RAIL | | |
0210 606.35 4.000 EA | 31.78000 127.12| 100.00000 400.00|
GUARDRAIL DELINEATOR POST | | |
0220 606.47 1.000 EA | 32.80000 32.80| 100.00000 100.00|
SINGLE WOOD POST | | |
0230 606.754 2.000 EA | 1127.50000 2255.00| 950.00000 1900.00|
WIDEN SHOULDER FOR GUARDRAIL 350 FLARED | | |
TERMINAL | | |
0240 606.79 2.000 EA | 1896.25000 3792.50| 2100.00000 4200.00|
GUARDRAIL 350 FLARED TERMINAL | | |
0250 609.31 271.000 LF | 5.75000 1558.25| 8.00000 2168.00|
CURB TYPE 3 | | |
0260 610.08 20.000 CY | 56.38000 1127.60| 75.00000 1500.00|
PLAIN RIPRAP | | |
0270 610.18 360.000 CY | 46.13000 16606.80| 61.00000 21960.00|
STONE DITCH PROTECTION | | |
0280 613.319 2860.000 SY | 1.54000 4404.40| 2.34000 6692.40|
EROSION CONTROL BLANKET | | |
0290 618.14 405.000 UN | 14.35000 5811.75| 25.00000 10125.00|
SEEDING METHOD NUMBER 2 | | |
0300 619.12 405.000 UN | 8.10000 3280.50| 20.00000 8100.00|
MULCH | | |
LETTING DATE : 03/09/05 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/09/05
PAGE : 3
COUNTIE(S): KENNEBEC TABULATION OF BIDS
CONTRACT ID : 011290.00
=========
====================================================================================================================================
|( 1 ) 000059 |( 2 ) 000004 |( )
|PIKE INDUSTRIES, INC. |BLUE ROCK, INDUSTRIES |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 627.75 1050.000 SF | 1.38000 1449.00| 3.50000 3675.00|
WHITE OR YELLOW PAVEMENT AND CURB | | |
MARKING | | |
0320 627.76 LUMP| 940.95000 940.95| 21000.00000 21000.00|
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
0330 629.05 15.000 HR | 45.00000 675.00| 50.00000 750.00|
HAND LABOR, STRAIGHT TIME | | |
0340 631.12 30.000 HR | 135.00000 4050.00| 105.00000 3150.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0350 631.14 30.000 HR | 135.00000 4050.00| 190.00000 5700.00|
GRADER (INCLUDING OPERATOR) | | |
0360 631.15 15.000 HR | 75.00000 1125.00| 95.00000 1425.00|
ROLLER, EARTH AND BASE COURSE | | |
(INCLUDING OPERATOR ) | | |
0370 631.172 60.000 HR | 65.00000 3900.00| 46.00000 2760.00|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0380 631.18 10.000 HR | 75.00000 750.00| 40.00000 400.00|
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0390 631.27 20.000 HR | 75.00000 1500.00| 95.00000 1900.00|
VIBRATING ROLLER (INCLUDING OPERATOR) | | |
0400 631.32 13.000 HR | 300.00000 3900.00| 195.00000 2535.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0410 639.20 2.000 EA | 8032.50000 16065.00| 11000.00000 22000.00|
FIELD OFFICE TYPE C | | |
0420 652.39 LUMP| 54968.26000 54968.26| 169000.00000 169000.00|
WORK ZONE TRAFFIC CONTROL | | |
0430 656.75 LUMP| 3075.00000 3075.00| 55000.00000 55000.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0440 659.10 LUMP| 104723.64000 104723.64| 210000.00000 210000.00|
MOBILIZATION | | |
SECTION TOTALS | $ 1,173,844.60| $ 1,894,630.50| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 1,173,844.60| $ 1,894,630.50| $
====================================================================================================================================