LETTING DATE : 05/17/06 MAINE DEPARTMENT OF TRANSPORTATION DATE : 05/17/06
PAGE : 1
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 012857.00 COMPLETION DATE : 07/15/06
=========
PROJECT(S): STP-1285(700)X LOCATION(S): HOULTON, HIGHWAY RESURFACING MAINE STATE DEPARTMENT OF TRANSPORTATION
STP-1285(900)X HOULTON ROUTE 1 (KENDALL ST)
STP-1288(900)X HOULTON (MILITARY ST.) A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : HOULTON, HIGHWAY RESURFACING. NOTARY PUBLIC
-------------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
-------------------------------------------------------------------------------------------------------------------------------
1 000022 LANE CONSTRUCTION CORP. (THE) $ 352,612.00 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (THE | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
SECTION 0001 HIGHWAY I
| | |
0010 202.202 12320.000 SY | 3.40000 41888.00| |
REMOVING PAVEMENT SURFACE | | |
0020 202.203 420.000 SY | 18.00000 7560.00| |
PAVEMENT BUTT JOINTS | | |
0030 304.103 30.000 CY | 60.00000 1800.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0040 403.209 100.000 T | 130.00000 13000.00| |
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS, | | |
DRIVES, INCIDENTALS) | | |
0050 403.210 1150.000 T | 79.00000 90850.00| |
HOT MIX ASPHALT 9.5 MM HMA | | |
0060 403.211 100.000 T | 79.00000 7900.00| |
HOT MIX ASPHALT (SHIMMING) | | |
0070 403.213 210.000 T | 79.00000 16590.00| |
HOT MIX ASPHALT 12.5 MM HMA BASE | | |
0080 409.15 640.000 G | 4.00000 2560.00| |
BITUMINOUS TACK COAT APPLIED | | |
0090 411.10 30.000 CY | 70.00000 2100.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0100 604.161 3.000 EA | 1400.00000 4200.00| |
ALTERING CATCH BASIN | | |
0110 604.164 1.000 EA | 4000.00000 4000.00| |
REBUILDING CATCH BASIN | | |
LETTING DATE : 05/17/06 MAINE DEPARTMENT OF TRANSPORTATION DATE : 05/17/06
PAGE : 2
COUNTIE(S): AROOSTOOK TABULATION OF BIDS
CONTRACT ID : 012857.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (THE | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
0120 604.18 21.000 EA | 750.00000 15750.00| |
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0130 608.46 170.000 SY | 12.00000 2040.00| |
REGRADING SIDEWALK | | |
0140 609.31 312.000 LF | 12.00000 3744.00| |
CURB TYPE 3 | | |
0150 627.711 6370.000 LF | 0.50000 3185.00| |
WHITE OR YELLOW PAINTED PAVEMENT | | |
MARKING LINE (PLAN QUANTITY) | | |
0160 627.76 LUMP | 5000.00000 5000.00| |
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
0170 629.05 20.000 HR | 30.00000 600.00| |
HAND LABOR, STRAIGHT TIME | | |
0180 631.10 30.000 HR | 50.00000 1500.00| |
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0190 631.11 30.000 HR | 50.00000 1500.00| |
AIR TOOL (INCLUDING OPERATOR) | | |
0200 631.12 15.000 HR | 110.00000 1650.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0210 631.172 30.000 HR | 55.00000 1650.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0220 631.32 15.000 HR | 155.00000 2325.00| |
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0230 643.50 10.000 EA | 3000.00000 30000.00| |
MICROWAVE TRAFFIC SIGNAL DETECTOR | | |
0240 652.38 1040.000 HR | 18.00000 18720.00| |
FLAGGER | | |
0250 652.39 LUMP | 37500.00000 37500.00| |
WORK ZONE TRAFFIC CONTROL | | |
0260 659.10 LUMP | 35000.00000 35000.00| |
MOBILIZATION | | |
SECTION TOTALS | $ 352,612.00| $ | $
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
CONTRACT TOTALS | $ 352,612.00| $ | $
====================================================================================================================================