LETTING DATE : 03/22/06 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/22/06
PAGE : 1
COUNTIE(S): HANCOCK TABULATION OF BIDS
WALDO CONTRACT ID : 007965.57 COMPLETION DATE : 06/30/06
=========
PROJECT(S): STP-7965(570) LOCATION(S): PROSPECT-VERONA, ACCESS GRADINGM&IPAVINGTE DEPARTMENT OF TRANSPORTATION
NH-7965(620)E PROSPECT-VERONA-BUCKSPORT
A TRUE COPY : __________________________
TITLE : __________________________
ATTEST : ____________________________ CONTRACT DESCRIPTION : PROSPECT-BUCKSPORT, ACCESS GRADING & PAVING NOTARY PUBLIC
-------------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
-------------------------------------------------------------------------------------------------------------------------------
1 000022 LANE CONSTRUCTION CORP. (THE) $ 744,601.00 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (THE | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 202.08 LUMP | 6000.00000 6000.00| |
REMOVING BUILDING NO.: | | |
0020 202.20 900.000 SY | 10.00000 9000.00| |
REMOVING BITUMINOUS CONCRETE PAVEMENT | | |
0030 202.202 14300.000 SY | 2.55000 36465.00| |
REMOVING PAVEMENT SURFACE | | |
0040 203.24 230.000 CY | 18.00000 4140.00| |
COMMON BORROW | | |
0050 203.27 3260.000 CY | 30.00000 97800.00| |
ROCK BORROW | | |
0060 304.103 1970.000 CY | 32.00000 63040.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0070 304.132 500.000 CY | 30.00000 15000.00| |
COLD RECYCLED AGGREGATE - TRUCK MEASURE | | |
0080 403.208 600.000 T | 59.50000 35700.00| |
HOT MIX ASPHALT 12.5 MM HMA SURFACE | | |
0090 403.209 100.000 T | 110.00000 11000.00| |
HOT MIX ASPHALT 9.5 MM HMA (SIDEWALKS, | | |
DRIVES, INCIDENTALS) | | |
0100 403.210 2000.000 T | 59.50000 119000.00| |
HOT MIX ASPHALT 9.5 MM HMA | | |
0110 403.213 1740.000 T | 59.50000 103530.00| |
HOT MIX ASPHALT 12.5 MM HMA BASE | | |
0120 409.15 1150.000 G | 5.00000 5750.00| |
BITUMINOUS TACK COAT APPLIED | | |
LETTING DATE : 03/22/06 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/22/06
PAGE : 2
COUNTIE(S): HANCOCK TABULATION OF BIDS
WALDO CONTRACT ID : 007965.57
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (THE | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
0130 502.341 24.000 CY | 400.00000 9600.00| |
STRUCTURAL CONCRETE ROADWAY MEDIAN | | |
0140 603.169 130.000 LF | 38.00000 4940.00| |
15 INCH CULVERT PIPE OPTION III | | |
0150 603.179 108.000 LF | 47.00000 5076.00| |
18 INCH CULVERT PIPE OPTION III | | |
0160 604.18 3.000 EA | 550.00000 1650.00| |
ADJUSTING MANHOLE OR CATCH BASIN TO | | |
GRADE | | |
0170 604.247 3.000 EA | 2200.00000 6600.00| |
CATCH BASIN TYPE F5-C | | |
0180 606.23 688.000 LF | 13.50000 9288.00| |
GUARDRAIL TYPE 3C - SINGLE RAIL | | |
0190 606.232 75.000 LF | 16.50000 1237.50| |
GUARDRAIL TYPE 3C - OVER 15 FOOT RADIUS | | |
0200 606.265 2.000 EA | 55.00000 110.00| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0210 606.352 2.000 EA | 5.00000 10.00| |
REFLECTORIZED BEAM GUARDRAIL DELINEATOR | | |
0220 606.362 650.000 LF | 2.50000 1625.00| |
GUARDRAIL ADJUSTED | | |
0230 606.367 10.000 EA | 55.00000 550.00| |
REPLACE UNUSABLE EXISTING GUARDRAIL | | |
POSTS | | |
0240 608.26 24.000 SF | 24.00000 576.00| |
CURB RAMP DETECTABLE WARNING FIELD | | |
0250 609.31 1300.000 LF | 8.00000 10400.00| |
CURB TYPE 3 | | |
0260 609.39 210.000 LF | 30.00000 6300.00| |
RESET CURB TYPE 2 | | |
0270 612.06 640.000 SY | 12.00000 7680.00| |
BITUMINOUS SEALING - BLACK | | |
0280 613.319 293.000 SY | 2.00000 586.00| |
EROSION CONTROL BLANKET | | |
0290 615.07 410.000 CY | 40.00000 16400.00| |
LOAM | | |
0300 618.1401 60.000 UN | 16.00000 960.00| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0310 618.1411 5.000 UN | 30.00000 150.00| |
SEEDING METHOD NUMBER 3 - PLAN QUANTITY | | |
LETTING DATE : 03/22/06 MAINE DEPARTMENT OF TRANSPORTATION DATE : 03/22/06
PAGE : 3
COUNTIE(S): HANCOCK TABULATION OF BIDS
WALDO CONTRACT ID : 007965.57
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|LANE CONSTRUCTION CORP. (THE | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
0320 619.1201 65.000 UN | 9.50000 617.50| |
MULCH - PLAN QUANTITY | | |
0330 619.1401 130.000 CY | 100.00000 13000.00| |
EROSION CONTROL MIX | | |
0340 627.76 LUMP | 12000.00000 12000.00| |
TEMPORARY PVMT. MARK LINE, W OR YELLOW | | |
0350 629.05 35.000 HR | 30.00000 1050.00| |
HAND LABOR, STRAIGHT TIME | | |
0360 631.12 100.000 HR | 110.00000 11000.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0370 631.14 35.000 HR | 110.00000 3850.00| |
GRADER (INCLUDING OPERATOR) | | |
0380 631.172 100.000 HR | 50.00000 5000.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0390 631.22 60.000 HR | 90.00000 5400.00| |
FRONT END LOADER (INCLUDING OPERATOR) | | |
0400 634.19 440.000 LF | 12.00000 5280.00| |
NON-METALLIC CONDUIT 2" PVC | | |
0410 634.19 440.000 LF | 10.00000 4400.00| |
NON-METALLIC CONDUIT 3" PVC | | |
0420 634.19 440.000 LF | 11.00000 4840.00| |
NON-METALLIC CONDUIT 3/4" PVC | | |
0430 652.39 LUMP | 30000.00000 30000.00| |
WORK ZONE TRAFFIC CONTROL | | |
0440 656.75 LUMP | 5000.00000 5000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0450 659.10 LUMP | 50000.00000 50000.00| |
MOBILIZATION | | |
0460 806.80 4.000 EA | 750.00000 3000.00| |
PRECAST CONCRETE LIGHT BASE | | |
SECTION TOTALS | $ 744,601.00| $ | $
------------------------------------------+-----------------------------+-----------------------------+-----------------------------
CONTRACT TOTALS | $ 744,601.00| $ | $
====================================================================================================================================