2003
Annual Report on
Electric
Restructuring
Presented
to the
Utilities
and Energy Committee
December
31, 2003
TABLE OF CONTENTS
I. BACKGROUND..................................................................................................................... 4
II. RETAIL MARKET ACTIVITY............................................................................................... 4
Migration from Standard Offer – Medium and Large Customers............................. 4
Migration from Standard Offer Service – Residential and
Small Commercial................................................................................................................. 6
Emergence of a Green Market........................................................................................... 6
Northern Maine Retail Activity........................................................................................... 7
Retail Supplier Activity........................................................................................................ 8
III. STANDARD OFFER SERVICE.......................................................................................... 9
Overview of 2003.................................................................................................................. 9
Solicitations......................................................................................................................... 10
Consumer-owned Utilities (COUs)................................................................................. 12
IV. STRANDED COSTS.......................................................................................................... 12
V. OVERALL CONSUMER PRICES.................................................................................... 14
VI. GENERATION RESOURCES.......................................................................................... 15
Resource Mix...................................................................................................................... 15
Re-evaluation of Maine’s 30% RPS.............................................................................. 17
Uniform Disclosure Labels............................................................................................. 17
Voluntary Renewable R&D Fund.................................................................................. 17
VII. REGIONAL ACTIVITY....................................................................................................... 18
Notable Changes in the Past Year................................................................................ 19
VIII. AFFILIATED COMPETITIVE PROVIDERS AND COMPLIANCE COSTS.............. 22
IX. ACTIVITIES IN OTHER STATES.................................................................................... 22
Appendix A................................................................................................................................. 23
Appendix B................................................................................................................................ 30
Appendix C................................................................................................................................ 31
2003 Annual Report on Electric Restructuring
Report to the Utilities and Energy Committee
Developed Pursuant to 35-A M.R.S.A. §3217
During
its 1997 session, the Legislature enacted P.L. 1997 (the Restructuring Act),
ch. 306, codified at 35-A M.R.S.A. §3201-3217, which directed comprehensive
restructuring of Maine’s electric utility industry. Since then, the Public Utilities Commission (Commission) has
disaggregated the vertically integrated electric utilities into delivery and
generation functions, established the rates of transmission and distribution
(T&D) utilities, established rules that govern the activities of
competitive electricity providers and utilities, purchased standard offer service
through competitive bid processes, monitored retail market development, and
participated in regional wholesale market activities that affect Maine’s
electricity consumers. When compared
with the experience in other states, Maine’s retail market has developed
smoothly and effectively in most respects.
Each year, pursuant to the Restructuring Act, the
Commission submits a report to the Legislature’s Joint Standing Committee on
Utilities and Energy, describing Maine’s retail market and activities the
Commission has taken to comply with the restructuring statute. This report
describes activities during 2003.
During 2003, the retail market for Maine’s medium and
large commercial and industrial (C&I) customers continued to exhibit a
reasonable level of competitive activity, and bidding for standard offer
service was healthy. The market
continued to offer minimal competitive choice for residential and small
commercial customers, but a low standard offer price obtained in previous years
contributed to relatively low overall electricity prices. In addition, green products emerged that
show promise of sustainability.
Migration from the standard offer to a competitive market
supplier began with large business customers and extended over time to smaller
business customers. After two years,
the vast majority of large customers and a substantial number of medium
customers had migrated from the standard offer. When customers’ supply contracts expire, they may choose
between a return to standard offer service or an open market contract, based on
their expectation of future market prices and their desire for price
predictability.[2] While migration to and from the competitive
market[3]
is influenced to some extent by the relationship between standard offer and
non-standard offer prices, the prevailing trend is for customers to remain in
the open market once they have migrated from the standard offer. The graph
below shows migration among CMP and BHE medium and large customers, and
reflects an overall trend toward migration to the open 
market.
The
Commission has concluded that medium and large class standard offer prices
should track wholesale prices as closely as possible, and, accordingly, we
accepted bids for 6-month terms throughout 2003. Because of market fluctuations, in March 2003, standard offer
prices for Bangor Hydro Electric Company (BHE) and Central Maine Power Company
(CMP) customers increased significantly and in September 2003 they decreased
slightly.
By early 2002, almost
all of Maine Public Service Company’s (MPS) large customers had migrated from
standard offer service. This did not
change in 2002 and 2003.
Migration from Standard Offer Service – Residential and Small Commercial
Acquisition
and service costs for small customers are significant, and no substantial
retail market has developed. However,
because Maine’s standard offer providers are chosen through competitive bidding
based on price, all residential and small commercial customers are purchasing
generation from competitive market suppliers, and vigorous competition among
bidders for standard offer service has resulted in attractive standard offer
service rates for smaller customers.
The
northern Maine market has deviated from this pattern, with as many as 15% of
MPS’s smaller customers migrating to the competitive market. As discussed later in this report, during
2003, a competitive provider in northern Maine ceased to offer service to new
customers, and customers subsequently began returning to standard offer
service.[4] In CMP’s and BHE’s territories, fewer than
one-tenth of one percent of customers have migrated from standard offer
service. However, as discussed in the
next section, migration may increase in the future.
Emergence
of a Green Market
During
2003, “green” products began to appear through the actions of residential and
public sector aggregation groups. These activities are showing early success at
gaining customers and public recognition.
In the residential and small commercial sectors, Maine Interfaith Power
and Light (MIPL), a non-profit aggregator, began soliciting customers
interested in receiving green power during 2002. In February 2003, these customers began receiving electric supply
that was generated using 50% in-state hydroelectric and 50% in-state biomass
fuel sources. The State of Maine
provided public recognition when it contracted to purchase this product for
over 700 State government buildings. In
addition, through MIPL, customers may purchase “green tags” representing 99%
wind and 1% solar generation.[5] By November 2003, in addition to the
State purchase, 1,300 customers were purchasing the green power product and
over 100 had purchased green tags.
An
additional green product emerged for business customers in the education,
health care, and non-profit sectors, when Maine Power Options, a non-profit
aggregator representing these sectors, arranged for the provision of
electricity produced solely from in-state biomass and hydroelectric
facilities.
|
Residential and Small Commercial Customers Migrated from
Standard Offer |
||
|
|
number |
percentage |
|
CMP |
1895 |
0.4% |
|
BHE |
402 |
0.4% |
|
MPS |
2882 |
8.0% |
The table to the right shows the number and
percentage of residential and small commercial customers[6]
in CMP, BHE and MPS service territories who were receiving competitive market
electric supply in December 2003. The
numbers for CMP and BHE are up markedly from January’s counts of 113 and 148,
respectively.
Northern
Maine Retail Activity
The
northern Maine region includes the service areas of MPS and three
consumer-owned utilities: Houlton Water Company, Van Buren Light and Power
District, and Eastern Maine Electric Cooperative.[7] In contrast to the rest of Maine, which is
electrically part of the ISO-NE region, northern Maine is electrically part of
the Canadian Maritimes region. The
Maritimes region also includes the electric loads and generation of New
Brunswick, Nova Scotia, and Prince Edward Island. Load and generation in northern Maine are connected to the rest
of Maine and New England only by transmission through New Brunswick. Northern Maine load is supplied by a combination
of generating plants located in-region and in New Brunswick. The Northern Maine Independent System
Administration (NMISA) administers the bulk power and transmission systems for
the region.
Although
the retail market in the MPS service area appears fairly competitive, with
about 52% of the load currently served by non-standard offer suppliers, there have been only two suppliers active in the
northern Maine retail market since retail access began – Energy Atlantic (EA)
and WPS Energy Services, Inc. In
February 2003, Energy Atlantic announced that it would no longer accept new
customers in northern Maine, although it would continue to provide service
under existing contracts through their terms.
EA cited deficiencies in the wholesale market and the small size of the
market as the primary reasons for its withdrawal.
The
experience to date and our discussions with suppliers indicate that others
share EA’s perspective. Measures that
would make northern Maine part of a larger market (e.g., a transmission line
connecting northern Maine to the New England grid or an open market in New
Brunswick) appear to be necessary to change this situation significantly. Appendix A provides additional discussion of
these issues and describes activities the Commission has undertaken to improve
the exchange of electricity between Canada and Maine generally.
During 2003, standard offer service prices in
northern Maine continued to remain acceptable and stable, although the degree
of supplier interest in competing to provide standard offer service remained
less than in the CMP and BHE territories.
An acceptable standard offer price mitigates to some degree the concerns
resulting from the existence of only one active market participant in the
region.
Retail Supplier Activity
Twenty-three suppliers of retail electricity are
licensed to serve customers in Maine.[8] During 2003, twelve suppliers actively
served customers. Three suppliers sold
power to the residential market, while all suppliers sold power to medium and
large C&I customers to some degree.
CMP and BHE’s C&I market shows a relatively healthy dispersion of
sales among all suppliers. Well over
half of the suppliers served more than 5% of the customers or load in either
CMP or BHE’s territory.[9] MPS’s supplier activity is discussed
elsewhere in this report. We have seen
a level of consolidation among suppliers in the form of single entities owning
multiple supply subsidiaries. However,
this situation has not appeared to harm the vitality of Maine’s retail market. We will continue to monitor this and all
market conditions that affect Maine’s consumers.
III. STANDARD OFFER SERVICE

By
customer class, standard offer service supplies about 66% of the load of medium
commercial and industrial (C&I) customers and 17% of the load of large
C&I customers in Maine, as shown by the graph on the right. Standard offer service continues to supply
virtually all residential and small commercial customers, as has been the case
since retail access began. By T&D
service area, standard offer service supplies about 61% of the load of CMP
customers, 76% of the load of BHE customers and 48% of the load of MPS
customers.
The
standard offer suppliers during 2003 and corresponding prices are summarized
below. The prices shown here are
averages; actual prices for the medium class may vary by month and for the
large class by month and time of day.
For more detailed prices, please see the Commission’s web page at http://www.maine.gov/mpuc/new%20standard%20offer/standard_offer_rates.htm.

Average
Standard Offer Prices in 2003
The
Commission held several solicitations for standard offer service during
2003. These solicitations were
competitive and successful, resulting in retail standard offer suppliers and
market-based prices for all customer classes.
Suppliers continue to become more comfortable with Maine’s retail
standard offer service model, and the level of participation in our
solicitations reflects this comfort.
The
first solicitation of the year was for standard offer service for the CMP and
BHE medium and large classes for the term beginning March 2003. The Commission issued RFPs in November 2002
and, in response, suppliers submitted indicative bid prices in December
2002. Staff and suppliers negotiated
and resolved contract terms and, in January 2003, suppliers submitted final
binding bids. After evaluating the
final proposals, the Commission designated FPL Energy Power Marketing, Inc.
(FPL) as the standard offer provider for the CMP and BHE medium classes and
Select Energy, Inc. (Select) as the standard offer provider for the CMP and BHE
large classes for the term March 1 through August 31, 2003. The Commission chose 6-month term bids for
all four classes so that standard offer prices could more closely follow
changes in market prices than would be possible, for instance, in the case of a
1-year term.[10]
The
average prices for standard offer service during the March-August period based
on the final bids are shown below:
|
CMP BHE Medium
C&I 5.9 ¢/kWh 5.9 ¢/kWh Large C&I 6.1 ¢/kWh 5.8
¢/kWh |
The
second standard offer solicitation of the year was again for the CMP and BHE
medium and large classes, for the term beginning September 2003. The Commission issued an RFP in early June
2003 and, after receiving indicative bids, negotiating contract and other
non-price terms, and receiving final bids, again designated FPL and Select to
serve the medium and large classes, respectively. The term was again set at six months (September-February) and the
average prices were set as shown below:
|
CMP BHE Medium
C&I 5.6
¢/kWh 5.6 ¢/kWh Large
C&I 5.7 ¢/kWh 5.4 ¢/kWh |
The
third solicitation of 2003 was to acquire standard offer service for MPS
customers. This solicitation covered
all three standard offer classes for the term beginning March 2004. The Commission sought proposals for term
lengths of 1 year and 34 months, the latter term to coincide with the end of
MPS’s purchased power contract with Wheelabrator-Sherman (W-S). MPS solicited bids to purchase its W-S
entitlement in a concurrent RFP process, and standard offer-entitlement
cross-contingent bids were explicitly allowed.
The
MPS standard offer RFP was issued in September. Suppliers submitted indicative bids in mid-October, and staff and
suppliers then negotiated and resolved contract and other non-price terms. Based on the final binding bids that
suppliers submitted on November 3, the Commission designated WPS as the
standard offer provider for all three MPS standard offer classes for a 34-month
term, March 1, 2004 – December 31, 2006.
The resulting standard offer prices are shown below:
MPS
Standard Offer – Term Beginning March 1, 2004
|
Class Price
Residential/Small Commercial 5.459 ¢/kWh Medium C&I 5.810 ¢/kWh Large C&I 6.400 ¢/kWh |
WPS’s
standard offer bid was contingent on also receiving the Wheelabrator-Sherman
entitlement at its bid price of, on average, 3.475¢/kWh for the same 34-month
term.
The
fourth and final standard offer solicitation of 2003 began with the release of
RFPs on November 18. This solicitation,
which is still ongoing, is to acquire standard offer service for the CMP and
BHE medium and large classes for the term beginning March 2004.
A
3-year standard offer arrangement with Constellation Power Source Maine, LLC
(Constellation) that began in March of 2002 continued to supply CMP and BHE
residential and small commercial customers during 2003. The standard offer prices, 4.95 cents/kWh
for CMP and 5.0 cents/kWh for BHE, will remain in effect through February
2005.
COUs carry out bid processes to procure standard
offer service in their territories. The
following table displays their current standard offer prices:
Standard
Offer Prices - Consumer-Owned Utilities
|
Utility |
Price |
Supplier |
|
Eastern Maine Electric Cooperative |
6.75
c/kWh |
WPS |
|
Houlton Water Company |
5.387¢/kWh |
WPS |
|
Van Buren Light and Power |
5.76
¢/kWh |
WPS |
|
Fox Islands Electric Cooperative * |
4.05
¢/kWh |
Exelon Power |
|
Madison Electric Works * |
6.604
¢/kWh |
Select |
|
Swans Island Electric Cooperative * |
3.5
¢/kWh–5.7¢/kWh |
Select |
|
Kennebunk Light and Power Co. * |
3.88
¢/kWh |
Exelon Power |
|
Monhegan Electric |
Exempt |
|
|
Matinicus Plantation Electric Co. |
Exempt |
|
|
Isle au Haut |
Exempt |
|
* Rate is approximate. It may vary monthly and is subject to a monthly true-up adjustment to reflect the actual costs of supply.
The Restructuring Act allows CMP, BHE and MPS to recover stranded costs in the rates they charge for delivery service. Stranded costs reflect the net, above-market costs for generation obligations that utilities incurred prior to industry restructuring. For example, stranded costs include the difference between payments the utilities must make pursuant to pre-existing purchased power contracts (primarily with qualifying facilities (QFs)) and the current market value of that power.
Stranded cost rates are re-set for CMP, BHE and MPS approximately every two to three years. The adjustments coincide with the sale terms of the utilities’ QF entitlements, because the amounts received from the entitlements sales offset stranded costs and are a significant component of total stranded cost rates. CMP and BHE stranded costs were re-set in 2002, while MPS’s rates are being considered now for the period beginning March 1, 2004.
The most significant changes in stranded costs will occur when utilities’ QF contracts expire. BHE’s stranded costs will decline significantly in 2006, while CMP’s will decline during the second half of the decade. Projections of stranded costs are shown in the chart below.

The major components of each utility’s stranded costs over the year March 2003 – February 2004 are set forth below:



Until 2003, stranded costs also included, as an offset, the proceeds from the utilities’ generation asset sales (referred to as the Asset Sale Gain Account or ASGA). In 2002, the ASGA offset CMP’s and BHE’s stranded costs by $43M and $5M respectively. However, in spring of 2001, the Commission approved a 0.8¢/kWh reduction in the stranded cost component of delivery rates for CMP’s medium and large customers to mitigate the impact of significantly increased market generation prices. In 2002, the Commission approved a modest extension of the rate mitigation for CMP’s and BHE’s large industrial customers (0.45¢/kWH and 0.4¢/kWh respectively), and in February 2003, the Commission approved a 0.3¢/kWh mitigation for CMP’s medium and large customers through February 2005. These rate mitigation activities exhausted CMP’s and BHE’s Asset Sale Gain Accounts.
Many consumers in Maine pay a lower overall price for
their electricity now than they did before restructuring. This is especially notable in CMP’s
territory, where distribution and stranded cost rates have decreased steadily
since CMP sold its generating assets in 1999.[11] Rate changes since 1999 are attributable to
many factors other than restructuring, including such diverse factors as
natural gas prices, utility cost containment efforts, and FERC cost-allocation
decisions. Furthermore, the prices for
C&I customers in particular vary considerably based on their operating
characteristics and their supply contract terms. Nonetheless, a comparison of average electricity prices in 1999
and 2003 is shown in the tables below.
Average Residential Rates Average Large
Industrial Rates

For
Customers on Standard Offer[12]
T&D
rate changes may occur in one of three T&D rate components. Distribution rates may change to reflect the
utility’s costs of delivering power and maintaining customer service. Transmission rates are determined annually
by the Federal Energy Regulatory Commission (FERC), and reflect the cost of
maintaining transmission facilities used to transport power throughout the region. Finally, stranded cost rate components
change as utilities’ generation contracts expire and market conditions
change. In addition, generation supply
prices – both standard offer and open market – fluctuate over time and may vary
considerably from supplier to supplier.
The following charts display the current components of
residential and large industrial prices in BHE, CMP, and MPS territories. The charts show that stranded costs still
comprise a significant portion of customers’ rates, while transmission rates
have a negligible impact on total rates.


Resource Mix
The Restructuring Act establishes a “30% Resource
Portfolio Standard (RPS),” that requires electricity suppliers (including
standard offer suppliers) to supply 30% of their Maine load from “eligible
resources.” The Act defines eligible resources to be generating units whose
capacity does not exceed 100 megawatts and that produce electricity from tidal,
fuel cells, solar, wind, geothermal, hydroelectric, biomass, and municipal
solid waste in conjunction with recycling, that qualify as small power
producers under Federal regulations, or that are efficient cogeneration
units.
During 2002,[13]
approximately 38% of Maine’s load was supplied by eligible resources. Approximately 30% was supplied by resources
designated as renewable in the Restructuring Act (hydroelectric, biomass,
municipal solid waste, wind, and solar).
Overall, suppliers used system power, which is power purchased from the
New England or Maritimes control area through daily bids, to supply over 45% of
Maine’s load requirements. A portion of
the system power was used to comply with Maine’s 30% requirement, while the
majority (over 80%) of the RPS was met through dedicated contracts. The following chart displays the resources
serving customers in 2002. Appendix B
contains additional information.

During
2002, NEPOOL implemented a “tradable attribute” certificate system known as the
Generation Information System (GIS).
The GIS allows for the trading of electricity attributes (e.g., fuel
source and emissions levels) separate from the energy commodity. During 2003, the Commission revised its
rules to require that suppliers demonstrate compliance with Maine’s 30% RPS
through GIS certificates. This change
reduces supplier compliance costs and simplifies Commission verification.
A
dispute continues between some qualifying facilities and utilities over which
entity retains the rights to GIS certificates associated with ongoing power
purchase contracts. During 2002, the
Commission investigated the issue and tentatively concluded that the utilities
retain the rights to the certificates and that the certificates therefore
should be transferred to the entitlement purchaser. During 2003, the matter was considered by FERC. A final decision is pending.
Re-evaluation
of Maine’s 30% RPS
In its 2003
session, the Legislature directed the Commission to investigate the
effectiveness of Maine’s 30% RPS in encouraging generation from renewable and
indigenous resources. The Commission’s
findings and recommendations will be reported on December 31, 2003.[14] In its draft report, the Commission
determined that the current RPS does not result in additional renewable or
indigenous generation but nonetheless may increase generation costs to Maine’s
electric consumers. The report will
summarize barriers and costs associated with specific renewable fuels, estimate
the cost of various incentive mechanisms, and outline potential improvements to
the current RPS structure.
Uniform Disclosure Labels
The
Restructuring Act directs the Commission to ensure that comparative information
regarding electricity supply is disseminated to customers. The Commission implemented this directive by
designing a uniform information disclosure label that contains a supplier’s
resource mix and emission information.
Residential and small commercial customer suppliers must provide a
disclosure label to their customers quarterly, and suppliers to larger
customers must provide the label annually.
Labels for standard offer providers may be found on the Commission’s web
page. A representative label is
contained in Appendix C.
During 2003, the Commission continued to improve the
clarity of the uniform disclosure label.
In addition, the Commission revised its rules and removed comparative
price information from the labels to avoid the confusion and potential
misinformation that may be conveyed if a supplier’s price varies over
time.
Voluntary Renewable R&D Fund
The Restructuring
Act directs the Commission to establish a program to allow electricity
customers to make voluntary contributions to fund renewable resource research,
development, and demonstration projects.
To date, customers have donated in excess of $100,000 through direct
contributions or monthly contributions through their electricity bills. The State Planning Office, which administers
the program, has contracted with the Maine Technology Institute (MTI) for distribution
of the funds to take advantage of MTI’s existing grant process infrastructure
and to leverage other grant funds. In
December 2003, MTI approved funding for a Chewonki Foundation and Hydrogen
Energy Center project to develop an energy system using hydrogen generators,
storage, and fuel cells. The project
would be funded through a variety of sources, including $40,000 from the
Voluntary Renewable R&D Fund.
With
the restructuring of the electricity market over the past several years, Maine
has become part of a broader regional market for wholesale electricity. The existing electric transmission system
allows generation within roughly 1,000 miles of the state to compete to serve
Maine customers and allows our generators to compete for load over a similar
area. The Legislature anticipated this and in 1997 enacted 35-A MRSA §3215,
which authorizes the Commission to participate in regional and national
activities to protect “the interests of competition, consumers of electricity,
or economic development of the state.”
The New England electric market is, and will remain for
the foreseeable future, a hybrid of competitive and regulated elements. The fundamental goal is to develop and
maintain a workably competitive wholesale generation market that will provide
the benefits of strong competition among suppliers while simultaneously
producing a reliable electric system and acceptable prices.
The
market operates under a set of rules approved by the Federal Energy Regulatory
Commission (FERC). New England’s
Independent System Operator, ISO New England (ISO-NE), is the day-to-day
operator of the electric grid and the generation markets. ISO-NE, in turn, operates under contract
with the New England Power Pool (NEPOOL), a New England organization comprised
of generators, electricity suppliers, T&D utilities, municipal electric
systems, and representatives of end-use customers. NEPOOL or ISO-NE files changes to market rules for approval by
FERC. These changes are developed
through NEPOOL committees, each of which is chaired by ISO-NE. In some cases, these filings have close to
unanimous support. In others, there is
a wide range of conflicting positions.
While the Commission is not a NEPOOL member, it often takes an active
role in the committees. The Commission
also intervenes and takes positions at FERC on matters affecting (1) the
competitiveness of the wholesale electric markets, (2) reliability, and (3)
prices paid by Maine electricity consumers.
This
section of the report outlines the changes in the market over the past years
and describes the Commission’s regional and national activities.
1. Standard Market Design. On March 1, 2003, ISO-NE switched to a new
“Standard Market Design” (SMD) for the electric energy market in New
England. (The energy market is the
largest and most important market.)
There are two major changes under this new approach. First, the energy market now comprises two
separate markets. In the Day Ahead
market, which covers energy transactions for the following day, buyers and
sellers can, but are not obliged to, lock in financial positions. Then, in the real time market, any
deviations between the Day Ahead market and the actual outcomes are cleared. This allows market participants to hedge
against unexpected events such as extreme weather or the unexpected loss of
supply resources, either of which can drive prices very high very quickly[15].
The
second change has particular importance to Maine consumers. Under SMD, customers in different regions in
New England pay different prices. This
happens for two independent, if related, reasons. First, SMD recognizes “transmission constraints.” This means
that, if there is more low cost generation in a region than can physically be
exported, the energy price in that region will decline to reflect the surplus
supply, while prices in the transmission import constrained or “congested” area
are likely to increase to reflect the limited generation supply. Second, SMD changes the way transmission
losses are charged[16]. Under SMD, marginal line losses are charged
to customers. In exporting regions such
as Maine, the “losses” can be negative, meaning that the effect of losses is to
reduce the price paid for electricity.
The
new SMD energy market became operational on March 1, 2003. Between April and October 2003, the average
wholesale price of electric generation in Maine was $41.89 per MWh while the
average New England Hub price (an index of typical New England prices) was
$46.27, roughly $4.40 higher. Maine’s advantage
comes from lower losses (which explain about 75% of the difference) and lower
congestion costs (accounting for the other 25%). Connecticut, the highest cost state in New England, paid average
wholesale prices of $47.95 or over $6.00 over Maine.
Savings
of this magnitude are significant for Maine.
For example, if Maine’s prices run, on average, $4.00 per MWH below
those of New England as a whole, Maine saves roughly $40 million per year. The table below shows the monthly prices for
Maine, the New England Hub, and Connecticut during this period. We cannot be certain that this price
advantage will continue. However, it
appears likely that such differences will remain, at least for the next few
years.

2. Financial Issues for Generators. A number of firms owning generation have
experienced serious financial problems, some of them resulting in bankruptcy
filings. This has at least two
implications: it suggests that market prices have been low, relative to these
firms’ expectations when they entered the market; and it indicates that the
risk of financing new generation will affect New England’s portfolio of
generation resources which in turn will affect the composition of the wholesale
electric markets.
3. ISO-NE’s Independence. ISO-NE has asserted its independent role to
a greater degree during the past year.
The ISO’s increasing independence has been strongly supported by the
Commission individually and as part of the New England Conference of Public Utility
Commissioners (NECPUC). Regulator
support of greater ISO independence offsets the inherent incentive for market
participants to support their own self-interest in issues before the ISO.
4. RSC Formation. The FERC has increasingly articulated the
need to have problems such as regional reliability issues addressed by entities
closer to the problem. The FERC has
thus encouraged the formation of Regional State Committees (RSCs) to address
reliability and other matters. In New
England, it is likely that an RSC will be proposed to the FERC in December
2003. The RSC is designed at this time
primarily to address matters concerning generation adequacy[17]
and transmission planning. The
Commission, through Chairman Welch, has been active in developing the RSC. In November, Governor Baldacci appointed
Kurt Adams as Maine’s representative to the new RSC.
5. RTO Formation. ISO-NE decided to restructure into a
Regional Transmission Organization (RTO) consistent with direction provided by
the FERC. ISO-NE currently operates
under an Interim Agreement with NEPOOL.
This agreement has been extended several times, most recently until
December 31, 2004. The ISO has
indicated that the organization has had more difficulty focusing on long-term
objectives because its existence has been periodically threatened as the
contract approaches its expiration date.
The ISO views one purpose of RTO formation as giving the ISO the
stability needed to ensure that it can function independently.
Another
reason for the ISO’s interest in RTO formation is to codify the ISO’s
operational authority over the transmission facilities of the transmission
owning utilities. While the Restated
NEPOOL agreement provides for ISO operational authority over such facilities,
many specific aspects of this operational authority are not set forth in that
document. A third reason for RTO
formation is to solidify the ISO’s authority to propose changes to the market
rules to FERC rather than sharing this authority with NEPOOL.
On
October 31, 2003, the Transmission Owners and ISO-NE jointly filed a petition
at FERC to form an RTO. The Maine
Commission and NECPUC have filed comments at the FERC, seeking to have the FERC
condition its approval upon certain changes being made to the RTO proposal. The
changes proposed by the Commission would, in our view, strengthen the
independence of the RTO while ensuring an appropriate level of openness and
responsiveness to concerns raised by those affected by the RTO’s actions.
6. Transmission Cost Allocation
The
Commission led a coalition of state regulators and public advocates in Maine
and Rhode Island, CMP, and a number of suppliers in proposing a revision to the
regional method for allocating the cost of transmission upgrades. The current system rolls into the regional
transmission rate the costs of all transmission upgrades above a certain kV
level. Because of excess generating
capacity in the State, Maine will not benefit from most of the upgrades in New
England. While FERC has recently issued
an order that continues NEPOOL’s current socialization policy, the Commission
continues to advocate for a result that is consistent with locational marginal
pricing and with the interests of Maine’s ratepayers.
The Restructuring Act requires T&D utilities and
their marketing affiliates to comply with comprehensive standards of conduct
and market share limitations. These
limitations are intended to prevent utility marketing affiliates from obtaining
any undue market advantage by virtue of their corporate relationship with
T&D utilities. The Act requires the
Commission to determine and report the actual and estimated future costs of
implementing these requirements.
During 2003, issues associated with standards of conduct
were minimal. CMP does not have a
marketing affiliate. BHE formed a
marketing affiliate, Emera Energy Services, Inc. (EES), but EES does not market
services in BHE’s territory. Finally,
during 2003, MPS’s marketing affiliate, Energy Atlantic, announced its intention
to withdraw from future marketing in MPS’s territory.
The Commission’s costs of implementing the affiliate
marketing requirements continue to be modest, comprising the use of internal
resources to act on BHE’s request to form its marketing affiliate[18]
and to consider a request by EA for a waiver of the terms of an agreement
associated with EA’s interaction with MPS.[19] The Commission, BHE, and MPS foresee that
their costs will continue to be moderate in the future.

IX. ACTIVITIES IN OTHER STATES
The Restructuring Act directs the Commission to report on
activities relating to changes in the regulation of electric utilities in other
states. During 2003, there was no
significant activity regarding implementation of competition. As shown in the map to the right,[20]
17 states and the District of Columbia allow retail competition for electricity
supply. Of the remaining states, 26 are
not currently carrying out restructuring activity, six have studied but are
delaying restructuring, and California has suspended restructuring.
Appendix A
Commission’s Activities to Lower Barriers to Electric
Sales between The United States and Canada
During
the 2003 legislative session, the Legislature enacted P.L. 2003 ch. 5, Resolve,
Regarding the Reduction of Barriers to the Transmission of Electricity, which
directs the Commission to work with the government of New Brunswick to study
ways to reduce costs and barriers to the flow of electricity between Maine and
Atlantic Canada. Pursuant to the
Resolve, this Appendix describes the Commission’s activities conducted in
response to the Resolve.
I. Summary
During 2003, the Commission continued to work with
representatives of the government of New Brunswick and market participants to
identify, and find ways to resolve, constraints on the electricity trade
between New Brunswick and Maine. This
activity builds upon work already done by the Commission (in particular, a
formal investigation of generation adequacy in northern Maine, heightened
monitoring of the number of competitive providers available in various regions
of Maine, and a report submitted to the Legislature on February 28, 2003
addressing in general the issues in northern Maine[21]). The activities this year do not involve any
sharp departure from our prior efforts or analyses, but rather have been
attempts to move towards solutions that are viewed, by the majority of market
participants, as appropriate steps toward a more fully integrated market.
The Commission examined two distinct but interrelated
markets: the first is the market in
northern Maine that is physically a part of the Maritimes Control Area, and
thus interconnected to the rest of Maine (and New England) only through
transmission lines to and through New Brunswick. The second is the market for electricity between New Brunswick
and Maine through the MEPCO transmission line, which extends (in theory) to
trade with the entire NE-ISO market .
There are two issues involving New Brunswick relating to
the northern Maine market (served by MPS, Van Buren, Eastern Maine Electric
Cooperative, and Houlton Water Company).
The first is whether there are sufficient sellers of electric energy
willing and able to serve the northern Maine market to ensure a competitive
price. Our concern here is driven in
part by the very small number of suppliers who have chosen to participate in
the northern Maine retail market. The
second is whether the physical interconnections with New Brunswick are
sufficient to provide northern Maine with the energy needed to provide system
reliability.
On
the first issue, it appears that, for a variety of reasons, New Brunswick Power
(NBP) possesses, but does not exercise, a high degree of market power. For this reason, the Commission is working
with the market participants and the government of New Brunswick to see what
further steps should be explored to ensure that electric energy prices in
northern Maine remain at acceptable levels.
Possibilities include a reduction in the "through and out"
transmission charges now paid to NBP by sellers in New England seeking to reach
the northern Maine market, the preservation of "back-up service” now
available to address the lack of firm south to north transactions on the MEPCO
line, and the addition of capacity in the transmission link between the NE-ISO
area and New Brunswick through, for example, a second tie line. The Commission expects proposals for adding
additional generation capacity to northern Maine to be made in the near future,
some of which may depend upon some modification to the current rules relating
to restructuring, in particular with respect to the role of MPS and other
T&D companies serving northern Maine.
With respect to trading between New Brunswick and New
England, including "southern" Maine, the primary issue is whether
there are transmission capacity or tariff impediments to the free flow of
energy. While at the moment New
Brunswick has surplus energy capacity, and flows from north to south (i.e. from New Brunswick to southern
Maine) are much more easily arranged than flows from south to north, both these
circumstances may change[22]
in ways that would provide a greater degree of "two-way"
trading. When New Brunswick's capacity
margins shrink, for example, there may be a market available to generators in
Maine (and elsewhere in New England) in which to sell their output. The ability to reach that market, however,
is currently constrained by the limitations on "firm" south to north
flows on the existing MEPCO line. Thus
there is renewed interest in developing additional south to north capacity,
either through improvements to the existing MEPCO line or by building a second
transmission line.
II. PUC Activities and Market Participants'
Concerns
During 2003, the Commission continued to solicit the
views of all participants in the Maine, Canada and New England electricity
markets to help inform our views of what could, and should, be done to ensure
that all consumers in Maine gain the greatest possible benefit from the broader
electricity markets. In particular, the
Commission sent a letter to interested persons (including all relevant market
participants and government agencies) asking for comment on "the existence
of specific institutional or structural barriers, and any unnecessary or
burdensome transaction costs associated with the flow of electricity from and
between (northern) Maine and Atlantic Canada." The Commission received written comment from the northern Maine
Independent System Administrator; Emera Inc.; Boundless Energy, LLC; ISO New
England; Maine Public Service; Energie NB Power; Houlton Water Company; and
Central Maine Power. The Commission
also hosted a meeting to discuss these and related issues in Houlton on
September 17, 2003. The meeting was
attended by representatives of all of those who had filed written comments, and
also by representatives of Bangor Hydro Electric Co.; the Office of Public
Advocate; Energy Supply; WPS Energy Services, Inc.; Duke Energy North America;
Van Buren Light & Power District; Loring Bio-Energy; New Brunswick Public
Utilities Board; and Eastern Maine Electric Coop.
While the comments and discussions raised a wide variety
of issues concerning the markets and offered an equally wide array of possible
solutions, a few themes emerged as the primary subjects for discussion and
further action. These were the effects
of the separate MEPCO tariff on transactions between New England and both
northern Maine and New Brunswick; the prospects for and possible benefits of a
second major transmission line between New Brunswick and the NE-ISO system; the
extent to which transmission rate "pancaking" diminishes the
competitive supply available to northern Maine; and the extent to which
localized solutions (including additional generation and local transmission)
may be required for market and reliability purposes in the northern Maine
market.
The Impact of the MEPCO Tariff
Some market participants suggested that the current MEPCO
tariff and scheduling practices impede trade between New Brunswick and New
England, and further reduce the opportunities for trade between New England and
northern Maine. In particular, some
objected to the need for energy suppliers to obtain reservations on the MEPCO
line, and pay an additional tariff beyond the New England Regional Network
Service rate. Some parties suggested
that it would be advantageous to the market if the MEPCO line were "rolled
into" the NE-ISO regional tariff.
The MEPCO owners raised two objections to "rolling
in" the MEPCO line. First, the
MEPCO owners have sold firm transmission rights on the lines; thus any attempt
to bring the MEPCO line under NE-ISO operational control would require some
financial accommodation to those who have already paid for long-term rights to
the transmission capacity. Second, the
NE-ISO regional transmission tariff is reset annually by the FERC based on
current costs, while the MEPCO line charges generators a fixed rate for
transmission over the line. Because the
MEPCO line is largely depreciated, the MEPCO tariff provides revenues above
current costs. Shifting MEPCO line
rates to the NE-ISO tariff would therefore result in a loss of profit to the
MEPCO owners.
While the parties agreed that the issue is still worthy
of study, our assessment is that the current MEPCO tariff structure is not a major
barrier to trade. For one thing, the
rate is relatively low, adding about $1.96 to each kW-year plus $0.47 per
MW-hour (on-peak) traded from Orrington to the New Brunswick border, and about
$3.51 per kW-year plus $0.84 per MW-hour (on-peak) from Maine Yankee to the
border. It also appears that the MEPCO
owners are working with the NE-ISO toward a satisfactory resolution of the
scheduling issues. Moreover, there are
legal impediments that would make it difficult to compel the MEPCO owners to
relinquish control over the line, or revise how the line is tariffed.
For
these reasons, the Commission does not view changes to the current MEPCO
structure and tariff to be a high priority.
Should the market demonstrate otherwise, however, it may be appropriate
to petition the FERC to require changes (for example, by bringing rates more in
line with current costs).
The Second Tie Line
Virtually all parties agreed that building a second tie
line from New Brunswick to the NE-ISO system would help, to some degree, both
the northern Maine market and the broader Maine/New Brunswick market. First, a second line would substantially
increase the ability to schedule, on a firm basis, transactions from the New
England system to New Brunswick (i.e. south to north) and thus into northern
Maine through New Brunswick. Second,
because New Brunswick's current surplus of capacity is likely to disappear in a
few years (at least temporarily), a second line would allow New Brunswick to
import the power it needs with less upward pressure on its wholesale
prices. It is worth noting, however,
that increasing the flow of energy from Maine into New Brunswick may have the
effect, to the extent that the existing transmission constraint between Maine
and the rest of New England is not relieved, of diminishing Maine's current
advantageous price position relative to New England.
Subject to ensuring that Maine customers -- both in
northern Maine and in NE-ISO areas -- receive benefits from the second line,
the Commission’s view is that building a second line would be a positive
development.[23] The New Brunswick and New England systems
are meteorologically diverse (New Brunswick peaks in winter, New England in
summer), so greater trade between the systems is likely to produce generation
efficiencies. Moreover, until the
existing transmission constraint between Maine and the rest of New England is
removed, increasing south to north flows provides some opportunity for
generators in southern Maine to find additional buyers.
Notwithstanding
these potential benefits, however, the Commission’s view is that it would be appropriate to insist, as a
condition of allowing the second tie to be built, upon commitments that
customers in northern Maine see a benefit.
For example, it might require that, even in periods of generation
capacity shortages in New Brunswick, New Brunswick allow an amount of energy to
flow through the New Brunswick transmission system sufficient to ensure
reliability and the opportunity for price competition in northern Maine. Similarly, it might be reasonable to require
that the tariff charges imposed by New Brunswick (and the owners of the new
line, if that line is not "rolled into" the NE-ISO regional tariff)
on energy flowing from New England to northern Maine be sufficiently low to
avoid discouraging sales from Maine and elsewhere in New England into northern
Maine, thus providing some price discipline to the northern Maine market.
The Commission has also committed to working closely with
the Maine DEP and other relevant state and federal agencies to ensure that the
process for obtaining permits for the second line (or other projects designed
to improve market conditions and reliability) is efficient and "user
friendly" without sacrificing the ability to consider legitimate input
from those affected by the proposals.[24]
Transmission Rate Pancaking
In order to deliver energy into northern Maine from New
England (including "southern" Maine), a supplier (or its customer)
must pay at least four transmission tariffs:
the rate within New England ("RNS"), the MEPCO rate, the
"through" New Brunswick rate, and a rate for the local system in
northern Maine. While none of these may
be prohibitive in itself, the accumulation of rates, and the need to deal
separately with each system, clearly discourage trade. Since the northern Maine market is so small,
it is not surprising that, since Maine opened its market, no trades have been
accomplished over this multi-tariff path.
In addition to the initiatives discussed above with
respect to MEPCO and possible conditions that might be placed on a second tie
line, parties are currently engaged in both bilateral and multi-party
discussions with the goal of reducing or eliminating the pancaking of
transmission rates. One idea that is
now being considered (and studied further) is whether it might be possible to
incorporate northern Maine into the New England tariff. If the second tie line were built, sellers
in New England would be able to reach northern Maine by paying only the regional
tariff plus any "through" New Brunswick charge.
The Commission will continue to work with the various
parties to encourage the elimination or reduction of rate pancaking.
Localized Solutions
In addition to the prospect of facilitating trade between
northern Maine and New England (through New Brunswick), several parties
indicated that increasing the generation within the northern Maine area itself,
and increasing the strength of the transmission links between northern Maine
and New Brunswick, should also be considered as part of the
"solution" to the market and system isolation of northern Maine.
It appears that MPS and NBP are addressing the most
immediate local transmission issues, relating to the reliability of the
existing links between their systems.
In fact, one important upgrade has already been completed in MPS
territory, and the MPS Board has approved another (which is currently being
negotiated with NBP).[25] We also understand that there are
discussions between and among the parties to determine what further
strengthening of the links may be cost-effective.
At least two generation projects[26]
are under active consideration within northern Maine. While they differ significantly in their characteristics, and in
the variety of approvals they would need, either or both would, to some extent,
enhance both the system reliability and market competitiveness of the
area. For that reason, we have
encouraged both projects to move forward, and have, as with the second tie line
project, committed to working with our sister state agencies to ensure a fair
and prompt review. From a purely
economic perspective, additional generation geographically located within
northern Maine may be indistinguishable from electric energy brought in from
New Brunswick or New England. There may
be, however, some reliability benefits to be gained by having additional local
generation, and of course there may be some economic development benefits to
the construction and operation of any new resources.
The
Commission has asked the parties to consider whether some form of
"capacity market," perhaps using a single buyer (who might be the
NMISA or even one of the T&D companies), should be introduced in northern
Maine to help provide financing for new generation projects. These discussions are continuing, and are
likely to be informed by similar discussions now taking place among the states
in the northeastern United States and at the FERC.
III. PUC activities and next steps
In light of the new standard offer for MPS, most
customers in northern Maine are largely protected from market failures through
December of 2006. This provides, in our
view, a degree of "breathing space" to enable the Commission and the
parties to work through the options described above. It may not be coincidental that at least some of the projects
(e.g. the tie line and some of the generation projects) are targeted to come on
line roughly during that period which also coincides with the termination of
the supply contract with Wheelabrator-Sherman.
The Commission approach in the near term, therefore, is to continue to
meet with the relevant parties (including through annual or even more frequent
meetings in northern Maine or New Brunswick) to review their progress, while
ensuring that the regulatory processes that may be necessary to bring helpful
projects to fruition are conducted expeditiously. We expect, in the near future, filings relating both to
generation projects in northern Maine and the second tie line (and/or upgrades
to the existing MEPCO line). The
Commission will also monitor developments within New Brunswick (in particular
the moves within New Brunswick to redesign its market structure) to determine
the impacts that such developments may have on Maine's electricity markets, and
to ensure to the extent possible that activities on both sides of the border
are complementary.
Finally,
as discussed earlier in this report, the Commission continues to monitor
whether significant changes are required in the rules governing the northern Maine
market to address the possibility that the restructuring model in place
elsewhere in Maine is unlikely to produce the same benefits due to the
geographic isolation and size of the market.
While the recent standard offer contract for northern Maine suggests
that, at least for the next three years, northern Maine consumers are not at a
pronounced disadvantage relative to their southern neighbors, we are reviewing
whether we should take additional steps to ensure that a reliable, and
competitively priced, supply of electric energy remains available for the long
term for those customers.
IV. Proposed legislation
We do not recommend, in the near term, any new
legislation to address the northern Maine market or the relationship between
Maine and the Maritimes provinces.
In
part because no single solution has emerged as clearly preferred, in part
because at least some of the proposals require no changes to existing law, and
in part because the new standard offer provides a degree of price stability for
most northern Maine customers, legislative intervention would be
premature. There is reason to believe,
however, that within the next twelve months the picture will become clearer,
and should legislation prove necessary to accomplish the reliability and market
objectives shared by the Legislature, the Commission and the market
participants, the Commission will bring forward appropriate legislation in time
for consideration in the next session.
Appendix B
Resources Serving Maine’s Customers in 2002

In
addition to the graph in section VI, the following graphs provide information
about the source of resources that served Maine’s customers’ loads during
2002. The first graph displays the
percentage of generation obtained through purchases of system power, as
compared with dedicated contracts. The
second graph displays the portion of dedicated contracts that purchased power
from facilities outside of Maine.

Appendix C
Uniform Disclosure Label
During 2003, the Commission worked
with suppliers and utilities to improve the clarity of the uniform disclosure
label. The following format is used for
all standard offer labels.

[1] The Commission rules establish three standard offer classes: residential and small commercial, medium commercial and industrial (C&I), and large C&I.
[2] To avoid significant disruption to standard offer service load requirements, Commission rules prohibit customers that take standard offer service after being in the competitive market from discontinuing standard offer service within a year unless they pay an opt-out fee. Customers may petition the Commission for exemption from the fee, and a significant number have done so. The opt-out fee is intended to provide an incentive to remain on the open market.
[3] Standard offer service providers are chosen through a competitive bid process, so all customers receive service through the open market. For convenience, we often refer to non-standard-offer providers as competitive providers.
[4] During the latter half of 2003, MPS discovered an ongoing reporting error in its small and medium customer migration statistics, so we do not show the migration statistics in this report. However, we estimate that almost 50% of residential and small commercial customers who had migrated to the competitive market returned to standard offer service between January and November 2003.
[5] A green tag purchases the credits that a supplier receives based on the fuel source of its generation.
[6] Residential and small commercial customers comprise the “small” standard offer class and their migration rates are combined for tracking purposes.
[7] Collectively, the customers of the four northern Maine utilities consume approximately 7% of the kWhs purchased in Maine.
[8] The Restructuring Act authorizes the Commission to license suppliers before they may provide generation service to customers. In some instances, a licensed supplier owns its own generation, while in others, the supplier purchases its generation through the wholesale market. In addition, the Commission licenses aggregators and brokers, who assist customers in obtaining generation but do not supply the generation themselves. Twenty-three aggregators and brokers are currently licensed.
[9] Some suppliers serve a small number of large customers and thus serve a large percentage of load, while suppliers serving a larger number of smaller customers serve a smaller percentage of load.
[10] The Commission first accepted a six-month bid in March 2003. Six-month standard offer terms seem to work well for both non-standard offer suppliers, who have told us that a shorter term helps them attract customers, and standard offer suppliers, who have told us that the shorter term mitigates against load and market risk but is not so short as to discourage their participation.
[11] CMP’s
T&D residential rate decreased 27% between February 2000 and July 2003.
[12] The table assumes
standard offer prices for generation.
Customers receiving generation from the open market will have lower or,
in some cases, higher generation rates than standard offer customers. In addition, industrial T&D rates vary
significantly. Rates for customers receiving transmission-level service are
less than those receiving distribution-level service and rates for customers on
special rate contracts are less than those on tariffed rates.
[13] The Commission will receive information about suppliers’ 2003 resource mix when suppliers file their annual reports in May 2004.
[14] The Renewables Report will be available on the Commission’s web page, www.state.me.us/mpuc under the Legislative Activities icon.
[15] Before SMD, the market was a simple real-time market and left market participants vulnerable to unexpected events.
[16] Any time electricity is transported, a portion of the electricity is lost. The loss percentages can range from less than 1% to 10% or more, depending primarily on the amount of current flowing over the line.
[17] For a description of our work in this area, see “A proposal for the structure of a capacity market for a competitive wholesale electricity market: Advance funding for the right and obligation to provide capacity” by Tom Welch and “The Maine Proposal for Capacity Adequacy – The 10,000-Foot View” by Tom Welch and Tom Austin. Both are available at http://www.maine.gov/mpuc/.
[18] The Commission approved the formation EES during 2002, and the Public Advocate and Competitive Energy Services appealed the decision to the Law Court. The appeal was denied in January 2003.
[19] When EA withdrew from the northern Maine market during 2003, it petitioned the Commission for a waiver of the requirements of Chapter 304 (Standards of Conduct for Transmission and Distribution Utilities and Affiliated Competitive Electricity Providers) of the Commission’s rules and of certain terms reached during a 2002 dispute regarding its affiliate interactions with MPS. The matter was resolved by stipulation, which was approved by the Commission.
[20] Source: Energy Information Administration. West Virginia is no longer active.
[21] The report may be found at http://www.maine.gov/mpuc/2002legislation/2002-2003Legislative%20Reports.htm under the “Maine/Canadian Regional Transmission Organization Report” icon.
[22] There is uncertainty concerning how long the Point Lepreau nuclear generation unit will continue to operate. If the unit goes out of service for an extended period of time, it becomes more likely that the current surplus capacity situation in New Brunswick will reverse, and New Brunswick could become a net importer of electric energy.
[23] At least one party suggested that there may be other ways of providing additional "firm" south to north capacity, for example by making certain modifications to the existing facilities. While difficult to evaluate in the abstract, we are indifferent to the technology used. It may be, moreover, that the additional capacity in both directions that a new tie would bring would be sufficient to justify the new line regardless of whether modifications are made to the existing line.
[24] Because it is likely that issues relating to the second tie line will come to the Ccommission for adjudication, any comments here concerning the desirability of the line must be viewed as tentative, and do not in any way indicate any view on whether the legal standards for approval have or can be met.
[25] Again, the Commission’s view of the need for a second tie line to serve New Brunswick may be influenced by the successful completion of projects needed to bring the benefits of any such project into northern Maine.
[26] The Commission is aware of a project for grid-scale wind in Mars Hill, and a gas-fired generator at Loring.